FIR14-00222
| INSP-Sprinkler Rough-in | 10/1/2014 | 10/1/2014 | 10/1/2014 3:30:17 PM | P | PASS |
|
|
Verified combustible concealed spaces are filled with insulation. Will need verification that the insulation is non-combustible. Also verified three added dry uprights to provide additiional protection where heads were previously overspaced.
|
BLD13-00906
| FIRE-Final Inspection | 10/1/2014 | 10/1/2014 | 10/1/2014 3:01:30 PM | P | PART |
|
|
Fire sprinkler, fire alarm and fire life safety complete in the new office area (basement, first & second floors). New office area only. The remaining new hanger area is not complete yet.
|
FIR14-00095
| INSP-Alarm Testing | 10/1/2014 | 10/1/2014 | 10/1/2014 2:59:54 PM | P | DONE |
|
|
Fire alarm complete in the new hanger. 110 power at the elevator and door mag has been repaired.
|
FIR14-00569
| INSP-Sprinkler Rough-in/Hydro | 10/1/2014 | 10/1/2014 | 10/1/2014 2:03:18 PM | P | PASS |
|
|
The underground hydro test passed
|
FIR14-00417
| INSP-Supply line flush | 9/30/2014 | 10/1/2014 | 10/1/2014 1:50:32 PM | P | CANC |
|
|
Not ready
|
FIR14-00357
| INSP-Supply line flush | 9/30/2014 | 10/1/2014 | 10/1/2014 1:50:17 PM | P | CANC |
|
|
Not ready
|
FIR14-00416
| INSP-Supply line flush | 9/30/2014 | 10/1/2014 | 10/1/2014 1:50:02 PM | P | PASS |
|
|
Underground supply line flush passed
|
FIR14-00356
| INSP-Supply line flush | 9/30/2014 | 10/1/2014 | 10/1/2014 1:48:51 PM | P | PASS |
|
|
Underground supply line flush passed
|
FIR14-00685
| INSP-Sprinkler Rough-in | 10/1/2014 | 10/1/2014 | 10/1/2014 1:46:26 PM | P | PASS |
|
|
sprinkler piping is ok to cover.
|
BLD14-02728
| FIRE-Final Inspection | 10/1/2014 | 10/1/2014 | 10/1/2014 1:16:17 PM | P | FAIL |
|
|
Door hardware has been addressed but the exit signs/emergency lights do not function
|
FIR14-00205
| INSP-Sprinkler Rough-in/Hydro | 10/1/2014 | 10/1/2014 | 10/1/2014 12:24:02 PM | A | PASS |
|
|
The remaining underground piping can be covered.
|
BLD14-02747
| FIRE-Final Inspection | 9/30/2014 | 10/1/2014 | 10/1/2014 9:21:37 AM | A | PART |
|
|
Temporary occupancy for fire is approved with scott's permission until the exit signs are repaired.
|