BLD14-02074
| BLD-Wall Bracing | 10/1/2014 | 10/1/2014 | 10/1/2014 4:20:26 PM | P | FAIL |
|
|
Josh Phone #: ###-####
|
BLD13-03318
| BLD-Conference | 10/1/2014 | 10/1/2014 | 10/1/2014 4:19:24 PM | P | DONE |
|
|
Review of riser room and questions about fire rating. Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD14-00650
| BLD-Conference | 10/1/2014 | 10/1/2014 | 10/1/2014 2:58:41 PM | P | DONE |
|
|
|
BLD14-00216
| BLD-Framing/Rough-in | 10/1/2014 | 10/1/2014 | 10/1/2014 2:12:32 PM | P | FAIL |
|
|
Richard Phone #: ###-####. Complete all draft stops in attic areas, repair the drholes in draft stop attic areas, complete all lateral bracing,Provide H2.5 on trusses at interior bearing walls at 2nd floor. Fireblock all furdowns, remove foam insulation from partwall penetrations and fire caulk. A tenting inspection for fire sprinklers is also required prior to energy code inspection. ok to insulate. Correction notice posted.
|
GCB14-00134
| GCB-Footing | 10/1/2014 | 10/1/2014 | 10/1/2014 1:09:15 PM | P | NR |
|
|
6971241. No forms set up. Will need to reschedule.
|
BLD12-01914
| BLD-Final | 9/30/2014 | 10/1/2014 | 10/1/2014 10:54:29 AM | A | PASS |
|
|
Brad Turk. Around 10:00am would be great. Phone #: ###-#### Inspection requested via web by Brad Turk. Ok for perm occ.
|
BLD14-00461
| BLD-Final | 9/30/2014 | 10/1/2014 | 10/1/2014 10:54:03 AM | A | PASS |
|
|
Brad Turk. Around 10:00am would be great. Phone #: ###-#### Inspection requested via web by Brad Turk. Ok for perm occ.
|
GCB14-00120
| GCB-Framing | 9/30/2014 | 10/1/2014 | 10/1/2014 9:45:05 AM | A | PASS |
|
|
Lockbox code 2380. Interior steel stud framed walls ok. No grid.
|
BLD14-02204
| BLD-Footing | 9/30/2014 | 10/1/2014 | 10/1/2014 9:14:25 AM | A | PASS |
|
|
MIke Phone #: ###-####
|