Inspections for the day of: Wednesday, October 1, 2014.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-02074 BLD-Wall Bracing10/1/201410/1/201410/1/2014 4:20:26 PMPFAIL
Josh Phone #: ###-####
BLD13-03318 BLD-Conference10/1/201410/1/201410/1/2014 4:19:24 PMPDONE
Review of riser room and questions about fire rating. Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD14-00650 BLD-Conference10/1/201410/1/201410/1/2014 2:58:41 PMPDONE
BLD14-00216 BLD-Framing/Rough-in10/1/201410/1/201410/1/2014 2:12:32 PMPFAIL
Richard Phone #: ###-####. Complete all draft stops in attic areas, repair the drholes in draft stop attic areas, complete all lateral bracing,Provide H2.5 on trusses at interior bearing walls at 2nd floor. Fireblock all furdowns, remove foam insulation from partwall penetrations and fire caulk. A tenting inspection for fire sprinklers is also required prior to energy code inspection. ok to insulate. Correction notice posted.
GCB14-00134 GCB-Footing10/1/201410/1/201410/1/2014 1:09:15 PMPNR
6971241. No forms set up. Will need to reschedule.
BLD12-01914 BLD-Final9/30/201410/1/201410/1/2014 10:54:29 AMAPASS
Brad Turk. Around 10:00am would be great. Phone #: ###-#### Inspection requested via web by Brad Turk. Ok for perm occ.
BLD14-00461 BLD-Final9/30/201410/1/201410/1/2014 10:54:03 AMAPASS
Brad Turk. Around 10:00am would be great. Phone #: ###-#### Inspection requested via web by Brad Turk. Ok for perm occ.
GCB14-00120 GCB-Framing9/30/201410/1/201410/1/2014 9:45:05 AMAPASS
Lockbox code 2380. Interior steel stud framed walls ok. No grid.
BLD14-02204 BLD-Footing9/30/201410/1/201410/1/2014 9:14:25 AMAPASS
MIke Phone #: ###-####