Inspections for the day of: Thursday, October 1, 2015.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-02357 FIRE-Final Inspection9/30/201510/1/201510/1/2015 3:00:49 PMACANC
Could not do life safety until the project related fire sprinkler permit is complete.
FIR15-00640 INSP-Sprinkler Rough-in/Hydro9/30/201510/1/201510/1/2015 2:58:54 PMPCANC
No water on site. No hydro performed.
FIR15-00655 INSP-Sprinkler Rough-in/Hydro9/30/201510/1/201510/1/2015 2:57:22 PMPCANC
No water on site. No hydro performed.
FIR15-00640 INSP-Supply line flush9/30/201510/1/201510/1/2015 2:28:14 PMACANC
No water on site. No flush performed.
FIR15-00655 INSP-Supply line flush9/30/201510/1/201510/1/2015 2:26:38 PMACANC
No water on site. No flush performed.
BLD15-03377 FIRE-Final Inspection9/30/201510/1/201510/1/2015 1:30:22 PMAFAIL
Provide address, provide sprinkler system modifications, provide fire extinguisher, provide sticker at main exit, repair or remove exit signs at both doors, remove thumb turn dead bolt from rear door. Wood flooring has been installed on exiting flooring/possible threshold concerns.
FIR15-00176 INSP-Sprinkler Rough-in9/30/201510/1/201510/1/2015 12:01:12 PMAPASS
Last phase of sprinkler piping is ok to cover.
FIR15-00551 INSP-Sprinkler Rough-in9/30/201510/1/201510/1/2015 11:09:12 AMAPASS
Underground supply piping is ok to cover
FIR15-00655 INSP-Sprinkler Rough-in9/30/201510/1/201510/1/2015 11:08:10 AMAPASS
Sprinkler rough-in and tenting inspection passed. Piping can be covered.
BLD15-00578 FIRE-Final Inspection10/1/201510/1/201510/1/2015 10:46:19 AMPPASS
Life safety passed. Approved single action hardware to be installed on Riser Room door prior to a building sign off
FIR15-00255 INSP-Final Inspection9/30/201510/1/201510/1/2015 10:42:33 AMAPASS
Permit finaled
FIR15-00433 INSP-Final Inspection9/30/201510/1/201510/1/2015 10:41:58 AMAPASS
Permit finaled
FIR15-00297 INSP-Sprinkler Rough-in/Hydro9/30/201510/1/201510/1/2015 10:40:14 AMAPASS
Underground flush passed