NAF15-00014
| INSP-Alarm Testing | 10/1/2015 | 10/1/2015 | 10/1/2015 5:01:12 PM | P | PASS |
|
|
Fire alarm system tested besides devices on south west side. Flow switches tested manually (no flow). Partial final. Elevator 2nd and 3rd floor recall still to be conducted.
|
NAF15-00006
| INSP-Final | 9/30/2015 | 10/1/2015 | 10/1/2015 5:00:47 PM | A | PART |
|
|
Partial final complete for North East side. To be verified at full final, heads in bathroom changed to intermediate and one head in 2nd floor hallway @ north east side changed to intermediate due to proximity to heat device. Also flow test and forward flow to be tested.
|
NAF15-00024
| INSP-Supply line flush | 10/1/2015 | 10/1/2015 | 10/1/2015 2:35:46 PM | P | DONE |
|
|
No flush, underground cover inspection. Depth is good until land slopes down to the pump house. Contractor verified that Owner ok to berm up ground there to reach appropriate cover, verify 6"-1' berm at final.
|