ELE18-02854
| Electrical Rough-In | 10/1/2018 | 10/1/2018 | 10/2/2018 4:56:58 AM | P | PASS |
|
|
Underground inspection Contact Scott Wilson Thank you Phone #: ###-#### Inspection requested via web by Tom Betty U/G for secondaries ok to cover
|
ELE18-03534
| Conference | 10/1/2018 | 10/1/2018 | 10/1/2018 2:51:04 PM | P | PASS |
|
|
after 2 // David Phone #: ###-#### Discussed service change and feeding power to detached garage. Owner seems very knowledgeable and has a good hand on task ahead.
|
ELE18-03616
| Conference | 10/1/2018 | 10/1/2018 | 10/1/2018 1:38:09 PM | P | DONE |
|
|
Dale Phone #: ###-#### Discussed kitchen circuits ran in for counter top receptacles
|
ELE13-02234
| ELE-Aging Inspection | 10/1/2018 | 10/1/2018 | 10/1/2018 1:12:28 PM | | DONE |
|
|
Still waiting for this to be scheduled
|
ELE18-03750
| Electrical Rough-In | 10/1/2018 | 10/1/2018 | 10/1/2018 1:04:54 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dustin Kuester Rough-in ok to cover
|
ELE18-03662
| Electrical Rough-In | 9/30/2018 | 10/1/2018 | 10/1/2018 12:47:44 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Tyler Ridley Nailplates throughout home missing
|
ELE18-03704
| Electrical Rough-In | 10/1/2018 | 10/1/2018 | 10/1/2018 12:19:37 PM | P | PASS |
|
|
Please contact Micah Hornback at ###-#### before arriving on site. I will ensure that one of our installers are present to meet you when you arrive. Thanks! Phone #: ###-#### Inspection requested via web by Jesse Simpson Verified listing and scope of work for Solar Array system
|
MIS18-00387
| ELE-Conference | 10/1/2018 | 10/1/2018 | 10/1/2018 12:07:54 PM | P | DONE |
|
|
all work being done w/o permits Does not appear tomhave any eletrical being done
|
ELE18-02062
| Final | 9/27/2018 | 10/1/2018 | 10/1/2018 11:45:08 AM | A | PASS |
|
|
Renee Phone #: ###-#### Final ok for ats work
|
ELE18-03054
| Final | 10/1/2018 | 10/1/2018 | 10/1/2018 11:25:07 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sarah Schuller
|
ELE18-02452
| Final | 9/28/2018 | 10/1/2018 | 10/1/2018 11:12:22 AM | A | PASS |
|
|
garage code 2018 or 2315 Phone #: ###-#### Inspection requested via web by Darryn Coburn Final ok
|
ELE18-02349
| Electrical Rough-In | 9/28/2018 | 10/1/2018 | 10/1/2018 10:04:41 AM | A | PASS |
|
|
Brad Phone #: ###-#### Rough-in ok to cover
|
ELE18-03577
| Final | 9/28/2018 | 10/1/2018 | 10/1/2018 9:41:15 AM | A | PASS |
|
|
Pls contact Bryce(Foreman) @ 2###-#### or Preston (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes Correction fixed final for Solar array ok
|
ELE18-00022
| Final | 9/28/2018 | 10/1/2018 | 10/1/2018 9:33:46 AM | A | FAIL |
|
|
Final for Master bedroom and bathroom Phone #: ###-#### Inspection requested via web by Same Electric Arc Fault protection required for master bed lights and outlets Wet bar receptacles shall not be on bathroom receptacle circuit
|
ELE18-03600
| Final | 10/1/2018 | 10/1/2018 | 10/1/2018 9:16:38 AM | A | PASS |
|
|
Access: lockbox code 2954 lockbox is located on second front door closest to the garage Phone #: ###-#### Inspection requested via web by Charles Davis Correction fixed final ok
|
ELE18-03054
| Electrical Rough-In | 9/28/2018 | 10/1/2018 | 10/1/2018 8:53:33 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sarah Schuller Solar final ok
|