FIR19-00221
| INSP-Sprinkler Rough-in | 10/1/2019 | 10/1/2019 | 10/1/2019 2:25:02 PM | P | PASS |
|
|
See the city approved plans for the apartment and the third floor corridor where piping is ok for cover.
tOM Phone #: ###-####
|
FIR19-00561
| INSP-Final Inspection | 9/30/2019 | 10/1/2019 | 10/1/2019 2:12:17 PM | P | PASS |
|
|
Permit finaled. Jeff Phone #: ###-####
|
FIR19-00372
| INSP-Final Inspection | 9/30/2019 | 10/1/2019 | 10/1/2019 1:35:48 PM | P | CANC |
|
|
Cancel per James. Bell is not working. Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR19-00733
| INSP-Final Inspection | 9/30/2019 | 10/1/2019 | 10/1/2019 1:35:13 PM | P | CANC |
|
|
Cancel per Alex. Phone #: ###-#### Inspection requested via web by Don Kartchner
|
FIR19-00561
| INSP-Sprinkler Rough-in | 10/1/2019 | 10/1/2019 | 10/1/2019 1:03:20 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered.
|
FIR19-00622
| INSP-Sprinkler Rough-in | 10/1/2019 | 10/1/2019 | 10/1/2019 12:14:53 PM | P | PASS |
|
|
Rough-in passed. Piping can be covered. #: ###-#### Inspection requested via web by Sam Ball
|
BLD19-03636
| FIRE-Final Inspection | 9/30/2019 | 10/1/2019 | 10/1/2019 11:34:29 AM | A | PASS |
|
|
Life safety passed. Paul Phone #: ###-####
|
NAF19-00099
| INSP-Final | 9/27/2019 | 10/1/2019 | 10/1/2019 10:54:59 AM | A | DONE |
|
|
Permit finaled.
Please call Nate at ###-#### with inspection time. Phone #: ###-#### Inspection requested via web by Lori Brungardt
|
FIR18-00503
| INSP-Final Inspection | 9/30/2019 | 10/1/2019 | 10/1/2019 10:09:06 AM | A | FAIL |
|
|
For todays inspection I was able to check spaqcing of the south wing and center section first floor. Several devices are overspaced and many more had the candellas set incorrectly. Plans do not match the install such as horns shown but horn/strobes installed (the horn/strobes are required) Contact is Dirk. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
BLD19-03627
| FIRE-Final Inspection | 9/30/2019 | 10/1/2019 | 10/1/2019 8:33:23 AM | A | FAIL |
|
|
Provide annual inspection for the fire extinguisher, install door hardware, repair exit sign, remove thumbturn dead bolt, provide entire submittal package. Steve Phone #: ###-####
|
BLD19-03663
| FIRE-Final Inspection | 9/30/2019 | 10/1/2019 | 10/1/2019 8:08:07 AM | A | PASS |
|
|
Life safety passed. The door to corridor to be provided with single action hardware as discussed prior to a building inspection.. Joan Phone #: ###-####
|
BLD18-03121
| FIRE-Final Inspection | 9/30/2019 | 10/1/2019 | 10/1/2019 7:26:53 AM | A | PART |
|
|
Life safety complete for apartments 103, 104, 203, 204, 303 and 304. Matt Phone #: ###-####
|