PLM01-03471
| Water and/or Sewer | 10/9/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | A | CANC |
|
|
KEN ###-#### out of town 10/10/2001 8:01:41 AM
|
PLM01-03207
| Med/Gas Systems | 10/9/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 10/9/2001 4:29:25 PM partial 24hour test ok, this is just for the o2and vac west side 2nd floor needs procedure room piping and test and risers. provide a shutoff valve in a box, in the corridor, for the 2nd floor o2 outlet. 10/10/2001 10:34:08 AM
|
PLM01-01709
| Final | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/10/2001 at 07:23:54. Contact: ###-####. spill resistant pvb required on baptismal font fill, womens toilets are leaking on floor, calk drinking fountain. 10/10/2001 9:44:52 AM
|
PLM01-03362
| Plumbing Rough-in | 10/9/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM00-04083
| Med/Gas Systems | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 10/10/2001 9:16:05 AM chair relocation south side in existing office, 24 hr. test ok
|
PLM01-02645
| Plumbing Rough-in | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/10/2001 at 10:13:27. Contact: ###-####.
|
PLM01-03480
| Water and/or Sewer | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | PASS |
|
|
|
PLM01-03446
| Plumbing Rough-in | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/10/2001 at 09:12:18. Contact: ###-####.
|
PLM01-03460
| Water and/or Sewer | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | PASS |
|
|
###-#### EDDIE
|
PLM01-03480
| Water and/or Sewer | 10/9/2001 | 10/10/2001 | 10/9/2001 12:00:00 AM | A | DONE |
|
|
TOM WATER ONLY
|