BLD00-03538
| BLD-Concrete | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | A | PART |
|
|
Added by Inspector: 340 On 10/10/2001 9:07:00 AM west end, upper deck & col's ok pend MTI reports...met onsite w/supt.
|
BLD01-02267
| BLD-Other | 10/9/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 15:17:53. Contact: ###-####...met onsite, header beam is secondary & doesn't req complete 3hr protection. 10/10/2001 2:08:43 PM
|
BLD01-01792
| BLD-Final | 10/9/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | A | PASS |
|
|
###-####...ok for c/o; card not at site. 10/10/2001 9:17:09 AM
|
BLD01-02441
| BLD-Framing/Rough-in | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | FAIL |
|
|
###-#### c/n , stairs, attic ventilation, brace panels...need elec r/i; homeowner job...2 story..."attic" unclear on plans. Owner wants to consider stair as ladder, denied. 10/10/2001 6:01:00 PM
|
BLD01-00531
| BLD-Framing/Rough-in | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | FAIL |
|
|
###-#### DRYWALL complete draft stops, firestops....sec 1 drywall ok 10/10/2001 6:02:08 PM
|
BLD00-03538
| BLD-Concrete | 10/9/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | PART |
|
|
###-#### MIKE...cols at upper deck, pend report 10/10/2001 2:55:12 PM
|
MEC01-03007
| Final | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 10/10/2001 at 08:48:10. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/10/2001 at 10:32:12.
|
MEC01-03040
| Pressure Test | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | FAIL |
|
|
JAN ###-####; c/n, need demand diagram, unable to access entire bldg...no rough-in of appliance. existing pipe is rough. 10/10/2001 6:36:51 PM
|
BLD00-03524
| BLD-Conference | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 10/10/2001 2:05:55 PM spoke w/ Larry Hanson, prop mgr...will advise tenant space not finalled by contractor...all work appears complete,card not turned in.
|
BLD00-01649
| BLD-Conference | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 10/10/2001 2:10:29 PM add'l c/n issued: support can lites w/ slack wire or show listing for bar hangers, complete firestops at roomsides
|
BLD00-01649
| BLD-Framing/Rough-in | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 340 On 10/10/2001 4:21:31 PM c/n: provide as built for 4th fl 2hr wall configuration, layout slightly changed from plan...show firestop listings for cable trays & large hydronic piping at same.
|
BLD01-00601
| BLD-Conference | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 10/10/2001 4:36:27 PM w/ new supt. Dave re c/n in effect for 1st fl shear walls
|
BLD01-00609
| BLD-Conference | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 10/10/2001 4:37:58 PM w/ supt re c/n in effect (bld01-00534) re shear walls & eng'g
|
BLD01-00602
| BLD-Conference | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 10/10/2001 4:38:44 PM w/ supt re sheathing...nailing ok
|
BLD00-02242
| BLD-Conference | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 340 On 10/10/2001 4:54:02 PM c/n, submit plans for ext work (in progress) "stop work"
|