ELE01-03500
| Rough-In Permanent Service | 10/9/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 12:23:08. Contact: ###-####. ele r/i only; service not at this time. 10/10/2001 1:40:45 PM
|
ELE01-03503
| Temporary Service | 10/9/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | A | FAIL |
|
|
###-#### JOHN . 305-6 (a). recepticle outlets shall have gfci protection. 110-12. all openings shall be closed. no job identification tag. posted, informed contractor. 10/10/2001 9:11:22 AM
|
ELE01-03452
| Electrical Rough-In | 10/9/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/09/2001 at 15:13:29. Contact: ###-####. ele r/i ok. 10/10/2001 9:56:09 AM
|
ELE01-01421
| Electrical Rough-In | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/10/2001 at 06:55:06. Contact: ###-####. basement storeage and hallway, 2-walls r/i. ok. 10/10/2001 10:23:30 AM
|
ELE01-03508
| Temporary Service | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | PASS |
|
|
###-####. temporary service pole
t/s oh glenn ele #3508-ok. 10/10/2001 3:56:28 PM
|
ELE01-03151
| Final | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | PASS |
|
|
SKIP ###-####. completed. 10/10/2001 3:30:16 PM
|
ELE01-00035
| Final | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | NR |
|
|
call 1st before insp need 15 min call ahead?? -will simmons- ###-#### not completed;
overhead garage light not operational. called contractor, left message. 10/10/2001 2:53:36 PM
|
ELE01-03511
| Final | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | CANC |
|
|
###-####. should have been for ele r/i. 10/10/2001 3:02:15 PM
|
ELE01-03511
| Electrical Rough-In | 10/10/2001 | 10/10/2001 | 10/10/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 403 On 10/10/2001 3:03:05 PM jetted-tub r/i; bathroom.
|