FIR05-00562
| INSP-Sprinkler Rough-in/Hydro | 10/10/2005 | 10/10/2005 | 10/10/2005 4:32:09 PM | P | FAIL |
|
|
Can not do a final as the sprinkler plans need to be resubmitted. Sprinkler piping is ok to cover in the new area.
|
FIR05-00562
| INSP-Final Inspection | 10/10/2005 | 10/10/2005 | 10/10/2005 4:31:50 PM | P | FAIL |
|
|
Can not do a final as the sprinkler plans need to be resubmitted. Sprinkler piping is ok to cover in the new area.
|
BLD05-01608
| FIRE-Final Inspection | 10/7/2005 | 10/10/2005 | 10/10/2005 4:30:33 PM | P | FAIL |
|
|
Inspection was actually for a conference. I went over life safety items with the contractor. This included providing an additional exit sign at the bottom of the stairs with approved door hardware on the second exit to the exterior stairway. Also needs automatic flush bolts on the main entry exit. The two interior doors that lead into the main exit lobby require approved door hardware unless plan review is ok with the thumbturn deadbolts. Fire extinguishers will be required on both levels as well.
|
FIR05-00210
| INSP-Alarm Testing | 10/10/2005 | 10/10/2005 | 10/10/2005 4:27:03 PM | P | FAIL |
|
|
Fire alarm contractor and the electrical contractor where unable to provide a voltage meter to measure standby battery requirements and did not have a telephone butt set for verification that two phone lines had been provided. I stopped test. No items inspected.
|
FIR04-00750
| INSP-Sprinkler Rough-in/Hydro | 10/10/2005 | 10/10/2005 | 10/10/2005 3:13:06 PM | P | PASS |
|
|
Hydro test for the outside canopy passed.
|
MIS05-00179
| FIR-Final | 10/10/2005 | 10/10/2005 | 10/10/2005 3:11:55 PM | P | PASS |
|
|
Life safety finaled
|
BLD04-02934
| FIRE-Final Inspection | 10/10/2005 | 10/10/2005 | 10/10/2005 1:43:23 PM | P | FAIL |
|
|
fire sprinkler plans are still in review and fire alarm failed. No life safety inspection performed.
|
MIS05-00136
| FIR-Final | 10/10/2005 | 10/10/2005 | 10/10/2005 1:37:23 PM | P | PART |
|
|
A temporary occupancy was given. Need max. occupant load sign for "98". Provide exit signs/emergency lights as discussed and marked on the plans. Repair the exit sign to the prep area. Mount fire extinguisher at point of sale and lower fire extinguisher in the kitchen. Panic hardware is required at main exit per review comments.
|
BLD04-02934
| FIRE-Final Inspection | 10/7/2005 | 10/10/2005 | 10/10/2005 12:13:17 PM | A | FAIL |
|
|
fire sprinkler plans are still in review and fire alarm failed. No life safety inspection performed.
|
BLD05-01523
| FIRE-Final Inspection | 10/7/2005 | 10/10/2005 | 10/10/2005 11:56:51 AM | A | FAIL |
|
|
ken; Phone #: ###-#### Provide approved door hardware on both exit doors and tag the fire extinguisher.
|
BLD05-02082
| FIRE-Final Inspection | 10/7/2005 | 10/10/2005 | 10/10/2005 10:41:18 AM | A | FAIL |
|
|
Tag fire extinguisher in lobby and test duct smoke detectors
|
FIR05-00316
| INSP-Final Inspection | 10/7/2005 | 10/10/2005 | 10/10/2005 10:10:39 AM | A | FAIL |
|
|
Only tested the phone lines and three tamper switches. Phone lines had to be repaired as I waited. A meter had to be found for testing batteries but it didn't work. The supervisory points received at the central station do not match plans. Need to test all devices. Need security to the outlet on same circuti to the facp.
|
BLD05-02607
| FIRE-Final Inspection | 10/7/2005 | 10/10/2005 | 10/10/2005 10:07:55 AM | A | FAIL |
|
|
The storage room needs approved hardware on all doors, fire extinguisher, test smoke evac system, ceiling installed and sprinkler pendant coverage corrected. Retail area needs a very short time line in writing that a new tenant is moving in or ceiling and sprinkler modifications performed. Also need to test the smoke evac system.
|