Inspections for the day of: Wednesday, October 10, 2007.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02913 BLD-Concrete10/10/200710/10/200710/10/2007 4:50:39 PMPDEFR
tom - deck - please call for access Phone #: ###-####. conc already placed when on site.
BLD07-01534 BLD-Framing/Rough-in10/10/200710/10/200710/10/2007 4:25:26 PMPPASS
Jack Phone #: ###-####. sw canopy.
BLD07-01378 BLD-Final10/9/200710/10/200710/10/2007 4:09:52 PMPPASS
lance - please call for access Phone #: ###-####
BLD07-01378 DOC - Permit Finaled10/10/200710/10/200710/10/2007 3:51:31 PMPPASS
All issues resolved.
BLD07-01053 BLD-Final10/10/200710/10/200710/10/2007 3:25:19 PMPPASS
Scheduled by a contractor via Hello! on 10/10/2007 at 7:33:13 AM. Contact: ###-####. ok for perm occ.
BLD07-00018 BLD-Final10/10/200710/10/200710/10/2007 3:02:19 PMPPASS
BLD07-00018 DOC - Permit Finaled10/10/200710/10/200710/10/2007 3:02:04 PMPPASS
Received Final Aff. letter from Camco. Letter of Completion issued.
BLD07-02145 BLD-Footing10/10/200710/10/200710/10/2007 2:35:10 PMPPASS
Scheduled by a contractor via Hello! on 10/10/2007 at 10:58:30 AM. Contact: ###-####. two interior column pad footings. ok. Also reviewed special insp. reports. ok.
BLD07-00610 BLD-Framing/Rough-in10/10/200710/10/200710/10/2007 2:17:53 PMPPART
paul Phone #: ###-####. Strap top plates at plumbing penetrations, compltet fire stop at 1hr walls and floor ceiling penetrations. ok to insul. c/n posted.
BLD07-00611 BLD-Framing/Rough-in10/10/200710/10/200710/10/2007 2:16:22 PMPPART
paul Phone #: ###-####. Needs to strap top plates at plumbing penetrations, south wall both units. Needs ti finish firestop at floor cieling assembly. ok to insul. c/n posted.
BLD07-00609 BLD-Energy code compliance10/10/200710/10/200710/10/2007 2:14:35 PMPPASS
paul Phone #: ###-####. ok to cover.
BLD06-02102 BLD-Final10/10/200710/10/200710/10/2007 11:19:53 AMANR
Scheduled by a contractor via Hello! on 10/10/2007 at 7:18:16 AM. Contact: ###-####.
BLD06-02105 BLD-Final10/10/200710/10/200710/10/2007 11:19:40 AMANR
Scheduled by a contractor via Hello! on 10/10/2007 at 7:25:15 AM.
BLD05-03468 BLD-Final10/10/200710/10/200710/10/2007 11:19:23 AMANR
Scheduled by a contractor via Hello! on 10/10/2007 at 7:19:26 AM.
BLD06-02103 BLD-Final10/10/200710/10/200710/10/2007 11:19:10 AMANR
Scheduled by a contractor via Hello! on 10/10/2007 at 7:23:01 AM. Contact: ###-####.
BLD06-02104 BLD-Final10/10/200710/10/200710/10/2007 11:18:54 AMANR
Scheduled by a contractor via Hello! on 10/10/2007 at 7:24:08 AM.
BLD07-00599 BLD-Conference10/10/200710/10/200710/10/2007 10:53:26 AMADONE
the earlier the better Phone #: ###-#### Internet Inspection Request from: paul thornton
BLD06-00575 Extend Permit 180 days10/10/200710/10/200710/10/2007 9:56:23 AMAPASS
BLD07-01261 BLD-Energy code compliance10/9/200710/10/200710/10/2007 9:45:57 AMAPASS
gary - insulation Phone #: ###-####. Exterior walls ok, pend plumbing.
BLD07-01973 BLD-Footing10/9/200710/10/200710/10/2007 9:22:18 AMAPART
jim Phone #: ###-#### - as late as possible. wip on interior column pad footings. Noted that their will be special insp. Noted to contractor to get copies of all special insp. reports to date for review on next insp.
BLD07-01804 DOC - Permit Finaled10/10/200710/10/200710/10/2007 8:17:40 AMPPASS