BLD08-01849
| BLD-Framing/Rough-in | 10/10/2008 | 10/10/2008 | 10/10/2008 4:20:03 PM | P | PART |
|
|
andy Note: please call 1/2 hr prior to inspection Phone #: ###-#### OK to rock except areas around hvac chase and furnace.....recall to inspect fireblock.
|
BLD08-01863
| BLD-Framing/Rough-in | 10/10/2008 | 10/10/2008 | 10/10/2008 4:18:16 PM | P | PASS |
|
|
Brad- call 30 min prior Phone #: ###-####
|
BLD08-00963
| BLD-Energy code compliance | 10/8/2008 | 10/10/2008 | 10/10/2008 4:17:59 PM | P | PASS |
|
|
Yvonne- call 1 hr prior to going for access Phone #: ###-#### or ###-####
|
ESC08-00783
| Site Preparation | 10/10/2008 | 10/10/2008 | 10/10/2008 2:26:59 PM | P | PASS |
|
|
Faridun
|
BLD08-01821
| BLD-Energy code compliance | 10/9/2008 | 10/10/2008 | 10/10/2008 2:25:03 PM | P | PART |
|
|
kyle Phone #: ###-#### Energy code OK ..... Misc framing corrections completed. Re-call for inspection of (2) layers continuous 5/8 rock behind proposed medicine cabinets at rated firewall.
|
BLD07-02083
| BLD-Energy code compliance | 10/8/2008 | 10/10/2008 | 10/10/2008 11:39:29 AM | A | PASS |
|
|
Foundation insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
|
BLD08-01557
| BLD-Final | 10/9/2008 | 10/10/2008 | 10/10/2008 11:37:31 AM | A | PASS |
|
|
Dennis Phone #: ###-####
|
BLD08-01557
| DOC - Permit Finaled | 10/10/2008 | 10/10/2008 | 10/10/2008 11:37:15 AM | P | PASS |
|
|
|
BLD08-01945
| BLD-Energy code compliance | 10/9/2008 | 10/10/2008 | 10/10/2008 11:36:55 AM | A | PASS |
|
|
dan Phone #: ###-####
|
BLD08-01975
| BLD-Foundation | 10/7/2008 | 10/10/2008 | 10/10/2008 11:00:37 AM | A | FAIL |
|
|
faridan Phone #: ###-#### C/N Patio built W/O any inspections....Need to verify 15' rear setbacks (not on site plan)...Need Wall section (approved) showing Sizes and spans of ceiling joists, headers etc. Bearing on rear wall?
|
BLD08-01791
| BLD-Framing/Rough-in | 10/9/2008 | 10/10/2008 | 10/10/2008 9:52:01 AM | A | PASS |
|
|
rod Phone #: ###-####
|