Inspections for the day of: Friday, October 10, 2008.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00373 INSP-Final Inspection10/10/200810/10/200810/13/2008 9:46:39 AMPCANC
Scheduled by a contractor via Hello! on 10/10/2008 at 8:38:50 AM. Contact: ###-####.
FIR08-00648 INSP-Final Inspection10/10/200810/10/200810/10/2008 3:22:52 PMPPART
A temporary occupancy was given with dave hannimans permission until the knox box is aquired. Per the contractor the fire dept will not be granted access beyond the entry lobby. I let the contractor know that this is a problem and that he is to contact dave and work out this issue. Also I made the fire alarm contractor install the smoke detector as shown on the drawings over the facp and provide an additional a/v in the east corridor. Both of these items will need to be tested monday.
FIR08-00639 INSP-Sprinkler Rough-in10/9/200810/10/200810/10/2008 1:57:53 PMACANC
To be rescheduled. Piping was not buried yet so that the hydro test could be performed.
BLD08-01574 FIRE-Final Inspection10/10/200810/10/200810/10/2008 1:00:20 PMPFAIL
Remove the deadbolt from the pharmacy door and provide verification that the installed lever hardware unlocks in a single motion.
BLD08-02078 FIRE-Final Inspection10/9/200810/10/200810/10/2008 11:18:10 AMAFAIL
See the city approved plans for deficiency locations which include incorrect hardware and sprinkler heads located too close to one another.
BLD08-01438 FIRE-Final Inspection10/10/200810/10/200810/10/2008 10:48:43 AMPFAIL
See the city approved plans, front sheet, for a list of deficiencies
BLD07-03070 FIRE-Final Inspection10/9/200810/10/200810/10/2008 10:42:52 AMACANC
To be rescheduled for monday and also needs the sprinkler permit called in for a final inspection.
BLD08-01991 FIRE-Sprinkler Rough-in10/10/200810/10/200810/10/2008 10:42:14 AMAPASS
The sprinkler piping can be covered and the sprinkler coverage appears to be ok.
FIR08-00609 INSP-Final Inspection10/9/200810/10/200810/10/2008 9:52:35 AMAPASS
Permit finaled
FIR08-00685 INSP-Sprinkler Rough-in/Hydro10/10/200810/10/200810/10/2008 9:52:17 AMAPASS
The sprinkler piping is ok to cover
FIR08-00454 INSP-Final Inspection10/9/200810/10/200810/10/2008 8:27:33 AMAFAIL
No access to inside of the house
FIR08-00454 INSP-Supply line flush10/9/200810/10/200810/10/2008 8:27:04 AMAFAIL
No access to inside of the house
BLD07-02123 FIRE-Final Inspection10/8/200810/10/200810/9/2008 3:28:39 PMAPASS
Corrections made per last inspection. KR