Inspections for the day of: Monday, October 10, 2011.
Number of inspections: 15
Percentage of inspections complete: 80 %
Percentage of inspections not complete: 20 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00119 Aging Inspection10/5/201110/5/2011   
ESC11-00624 Site Preparation10/6/201110/6/2011   
ESC11-00509 General Inspection10/7/201110/7/2011   
GCM11-00131 GCM-Final10/7/201110/10/201110/10/2011 5:03:03 PMAPASS
Doug @ ###-####Call for access
MEC11-03156 Final10/6/201110/10/201110/10/2011 4:40:47 PMPPASS
Please contact homeowner Carmen at ###-#### prior to inspection, if homeowner is not available, please contact Josh at ###-#### Phone #: ###-#### >> Inspection requested via web by Josh Blake
MEC11-03137 Final10/7/201110/10/201110/10/2011 2:00:02 PMPPASS
Please call before arriving, thanks Phone #: ###-#### >> Inspection requested via web by Tom Soniville
MEC11-03132 Final10/4/201110/10/201110/10/2011 1:45:14 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Shannon Wells
GCM11-00169 GCM-Final10/7/201110/10/201110/10/2011 11:42:55 AMAPASS
Chris @ ###-####Unit Heaters 1 & 7
GCM11-00173 GCM-Final10/6/201110/10/201110/10/2011 11:07:52 AMANR
Rich @ ###-####..not ready until tuesday
GCM11-00173 GCM-Pressure Test10/6/201110/10/201110/10/2011 11:06:57 AMANR
Rich @ ###-####...not ready until tuesday
MEC11-03172 Pressure Test10/10/201110/10/201110/10/2011 11:03:15 AMAPASS
john ###-####...20lb gas ok
MEC11-03172 Final10/7/201110/10/201110/10/2011 11:02:48 AMAPASS
oil to gas, witness pressure test and final. furnace inside walk in cellar, enter though door on south side (opposite street) of residence. Phone #: ###-#### >> Inspection requested via web by John Bertram...furnace and gas ok
MEC11-03158 Final10/7/201110/10/201110/10/2011 10:15:26 AMAPASS
Please contact and schedule inspection time with homeowner Marianne Hickman at ###-#### Phone #: ###-#### >> Inspection requested via web by Josh Blake
MEC11-03183 Rough-in10/7/201110/10/201110/10/2011 9:33:00 AMANR
please complete rough in & pressure test inspection. please contact eric with any issues ###-#### Phone #: ###-#### >> Inspection requested via web by Alana Lane...need to schedule the duct blaster
MEC11-03114 Rough-in10/7/201110/10/201110/10/2011 9:30:56 AMAPART
8:30 meet troy and Rob...ok for cover...no duct blaster required as all duct in conditioned space...no gas appliances to be installed