ESC13-00823
| Site Final | 10/10/2013 | 10/10/2013 | 10/11/2013 10:18:28 AM | P | PASS |
|
|
Roger called for reinspection of stabilization. Plot has been reseeded and graded to allow growth. No construction materials or debris remaining on site. Approved. No further ESC inspections required. BLD permit is open but was contigent on ESC conditions, so should also be finaled. Called Roger to confirm approval.
|
ESC12-01033
| General Inspection | 10/10/2013 | 10/10/2013 | 10/10/2013 3:36:45 PM | | PASS |
|
|
No ESC corrections. WIP, no track out to 8th Street.
|
ESC12-00689
| Site Preparation | 10/10/2013 | 10/10/2013 | 10/10/2013 3:30:52 PM | P | FAIL |
|
|
Random inspection (not site prep) MS4 drop inlet downstream on Bogus Basin Road has damaged inlet bag. Broken bag needs to be removed before permit can be finaled.
|
ESC13-00689
| Site Preparation | 10/10/2013 | 10/10/2013 | 10/10/2013 3:23:17 PM | P | CANC |
|
|
Void. Data entry error. AJL
|
ESC12-00539
| General Inspection | 10/10/2013 | 10/10/2013 | 10/10/2013 3:18:41 PM | | PASS |
|
|
|
ESC12-00904
| DOC - Permit Finaled | 10/10/2013 | 10/10/2013 | 10/10/2013 2:45:04 PM | P | PASS |
|
|
Construction complete. Site stabilized and landscaped. All other permits finaled. No further ESC requirements.
|
ESC12-00508
| General Inspection | 10/10/2013 | 10/10/2013 | 10/10/2013 2:32:04 PM | | PASS |
|
|
Construction is complete on house and landscaping is being installed. Ground FX was working to put bark down. Talked to employee Tim and discussed clean up of bark in gutter and street. He said they have brooms and blowers to clear bark onto property. Rest of site looks good.
|
ESC13-00316
| Aging Inspection | 10/10/2013 | 10/10/2013 | 10/10/2013 1:24:57 PM | | PASS |
|
|
Finaled.
|
ESC13-00316
| DOC - Permit Finaled | 10/10/2013 | 10/10/2013 | 10/10/2013 1:24:33 PM | P | PASS |
|
|
Project is complete and stabilized. All other permits already finaled. No further ESC requirements.
|
ESC13-00267
| Aging Inspection | 10/10/2013 | 10/10/2013 | 10/10/2013 1:13:07 PM | | PASS |
|
|
Approved. Site is associated with ESC 13-00268. No corrections.
|
ESC13-00268
| Aging Inspection | 10/10/2013 | 10/10/2013 | 10/10/2013 1:10:51 PM | | PASS |
|
|
No ESC corrections. Unstabilized ground contained by curbing and subgrade. No track out. Permit posted along Irene. Approved- WIP
|
ESC13-00300
| Aging Inspection | 10/10/2013 | 10/10/2013 | 10/10/2013 1:02:47 PM | | PASS |
|
|
Finaled - see notes.
|
ESC13-00300
| DOC - Permit Finaled | 10/10/2013 | 10/10/2013 | 10/10/2013 1:02:30 PM | P | PASS |
|
|
Construction complete. Grass has been planted in front. Adjacent lot free of consruction materials and is stabilized. No further ESC inspections required. BLD permit has been finaled.
|
ESC13-00912
| BMP Violation | 10/9/2013 | 10/10/2013 | 10/10/2013 11:58:43 AM | P | PASS |
|
|
Rob RP # ###-####
Permit was posted as requested. Construction entrance and wattles placed on site. Corrections made in timely matter. Called RP to confirm re-inspection approval.
|
ESC13-00886
| Random Inspection | 10/10/2013 | 10/10/2013 | 10/10/2013 11:41:30 AM | A | PASS |
|
|
Wattles in place and permit posted at job staging site off Joplin Road. Vegetated buffer protects Thurman Mill Canal. No cement work yet. Minimal trackout. Was on site for UV project and phosphourous project
|
ESC12-00147
| General Inspection | 10/10/2013 | 10/10/2013 | 10/10/2013 11:20:49 AM | | PASS |
|
|
Project is still in progress. Work site contained in old earthen retention pond and is bermed. No ESC violations.
|
ESC12-00023
| General Inspection | 10/10/2013 | 10/10/2013 | 10/10/2013 10:09:03 AM | | PASS |
|
|
Work on McMillan side of Hyatt has ongoing road work by ACHD. No ESC violations at this time.
|
ESC11-00176
| General Inspection | 10/10/2013 | 10/10/2013 | 10/10/2013 8:57:37 AM | | PASS |
|
|
BMPs implemented, permit posted. No corrections
|