FIR14-00325
| INSP-Final Inspection | 10/10/2014 | 10/10/2014 | 10/10/2014 3:38:46 PM | P | PASS |
|
|
permit finaled
|
FIR14-00325
| INSP-Supply line flush | 10/10/2014 | 10/10/2014 | 10/10/2014 3:37:48 PM | P | PASS |
|
|
UG flush passed
|
BLD14-01932
| FIRE-Final Inspection | 10/10/2014 | 10/10/2014 | 10/10/2014 2:25:45 PM | P | FAIL |
|
|
Provide exit sign/emergency light and exit discharge light at the rear exit as per the approved plans. All other items are ok.
|
FIR14-00581
| INSP-Sprinkler Rough-in/Hydro | 10/9/2014 | 10/10/2014 | 10/10/2014 1:24:28 PM | A | PASS |
|
|
1st floor hydro test passed on the second try.
|
BLD14-02892
| FIRE-Final Inspection | 10/9/2014 | 10/10/2014 | 10/10/2014 10:40:04 AM | A | PASS |
|
|
Life safety passed
|
BLD14-01864
| FIRE-Final Inspection | 10/9/2014 | 10/10/2014 | 10/10/2014 9:14:29 AM | A | CANC |
|
|
Cancel per Aaron Phone #: ###-####// please call 30 min prior
|
FIR13-00725
| INSP-Sprinkler Rough-in | 10/9/2014 | 10/10/2014 | 10/10/2014 9:09:53 AM | A | PASS |
|
|
Rough to cover passed for 4th floor Bathrooms and the 3rd floor Hallway as marked on the city approved plans with todays date.
|