Inspections for the day of: Tuesday, October 10, 2017.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-02513 ELE-Aging Inspection10/10/201710/10/201710/10/2017 2:43:30 PM DONE
contact has been made with permit holder and still waiting for final inspection to be scheduled
ELE17-03402 Permanent Service10/9/201710/10/201710/10/2017 2:29:44 PMPPASS
Contact: Brian Gee Phone #: ###-#### Inspection requested via web by Deb Gooden..

p/s u/g rec ok
ELE17-03413 Final10/10/201710/10/201710/10/2017 2:02:21 PMPPASS
terminate underground feed Phone #: ###-#### Inspection requested via web by Kendra Lanham...replacement of riser pipe after hit by car,,,ok to final permit...work all done
ELE17-02122 Rough-In Permanent Service10/10/201710/10/201710/10/2017 1:28:50 PMPPASS
Please contact Gary ###-#### with any concerns. Phone #: ###-#### Inspection requested via web by Tracy Robertson...rough ok to cover...p/s u/g n ok 5 meters...check outside pancakes changed out at final
ELE17-03397 Temporary Service10/10/201710/10/201710/10/2017 1:05:13 PMPPASS
Temp Power Phone #: ###-#### Inspection requested via web by Zane Robertson...t/s o/h ok..back of lot
ELE17-02755 Permanent Service10/10/201710/10/201710/10/2017 11:30:38 AMPPASS
Phone #: ###-#### Inspection requested via web by Jerry Moore...p/s u/g n ok
ELE17-03395 Final10/9/201710/10/201710/10/2017 11:22:19 AMPCANC
Phone #: ###-#### Inspection requested via web by sam petterson...job has been previously looked at and passed final inspection under permit ELE17-03244
ELE17-00811 Final10/9/201710/10/201710/10/2017 10:52:39 AMAFAIL
Final Phone #: ###-#### Inspection requested via web by Zane Robertson...1) light in data room needs installed, m/c laying on floor 2) bath outlet has hot/neutral reversed 3) panels need labels 4) water fountain outlet needs completed 5) heater in hallway needs installed and labelled location in panel 6) panels need labelled legibily 7) access to RTU units on roof to verify correct installation
ELE17-02453 Final10/9/201710/10/201710/10/2017 10:48:01 AMAFAIL
Final Phone #: ###-#### Inspection requested via web by Zane Robertson...1) switch in bathroom needs to be installed completely
2) bath light switch and GFI need sparkrings installed, boxes set back more 1/4"
ELE17-02472 Final10/9/201710/10/201710/10/2017 10:48:01 AMAPASS
Final Phone #: ###-#### Inspection requested via web by Zane Robertson...ok to final
ELE17-01132 Final10/9/201710/10/201710/10/2017 9:57:00 AMAFAIL
Scott-call when on your way to meet for access Phone #: ###-####...all bedroom openings shall have AFCI protection
ELE17-00940 Final10/9/201710/10/201710/10/2017 9:02:01 AMPPASS
CATCHING UP ON INSPECTIONS FOR INSTALLS PRIOR TO NEW RULES.
PLEASE CALL AARON IF YOU HAVE ANY QUESTIONS. Phone #: ###-#### Inspection requested via web by Dana Vance...UL labelling with controller and disconnect on roof...ok to final
ELE17-00982 Final10/9/201710/10/201710/10/2017 8:38:51 AMPPASS
Install prior to July Rules. Call Aaron if you have any questions. Phone #: ###-#### Inspection requested via web by Dana Vance..UL labels on letters ok to final
ELE17-01641 Final10/9/201710/10/201710/10/2017 8:29:36 AMPPASS
You can inspect anytime. These signs were installed prior to July 2017 rules. Phone #: ###-#### Inspection requested via web by Dana Vance...UL label and disconnect installed..ok to final
ELE17-02603 Final10/9/201710/10/201710/10/2017 8:28:51 AMPPASS
Phone #: ###-#### Inspection requested via web by Dana Vance...UL listed and disconnect installed..ok to final
ELE13-03204 ELE-Aging Inspection10/10/201710/10/201710/10/2017 8:17:23 AM FAIL
contractor needs to get access and schedule inspection