PLM17-01000
| PLM-Aging Inspection | 10/10/2017 | 10/10/2017 | 10/13/2017 12:32:30 PM | | PEND |
|
|
Contractor to schedule with the homeowner
|
PLM17-00994
| PLM-Aging Inspection | 10/10/2017 | 10/10/2017 | 10/12/2017 3:01:12 PM | | PASS |
|
|
|
PLM17-03890
| Final | 10/10/2017 | 10/10/2017 | 10/10/2017 4:20:05 PM | P | PASS |
|
|
late pm please Phone #: ###-#### Inspection requested via web by Krista Boss
|
PLM17-03877
| Med/Gas Systems | 10/10/2017 | 10/10/2017 | 10/10/2017 4:14:44 PM | P | CANC |
|
|
Gas pressure test call thomas with questions ###-#### Phone #: ###-#### Inspection requested via web by Nick Drake
|
PLM17-03817
| Water and/or Sewer | 10/3/2017 | 10/10/2017 | 10/10/2017 4:08:15 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Chris Field
|
PLM17-03744
| Final | 10/9/2017 | 10/10/2017 | 10/10/2017 3:18:21 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone. Pressure test the flue. Support the flue from the horizontal to vertical connection to support the riser through the roof
|
PLM17-02953
| Final | 10/10/2017 | 10/10/2017 | 10/10/2017 2:31:21 PM | P | PART |
|
|
Tom Phone #: ###-####. Daryl to review with Tom from prior conversation about backflow assembly for the ice maker filter
|
PLM17-02428
| Final | 10/10/2017 | 10/10/2017 | 10/10/2017 1:58:35 PM | P | PASS |
|
|
Home owners will be home. Thank you Phone #: ###-#### Inspection requested via web by Troy Paulin
|
PLM16-04347
| Sprinkler (Final) | 10/10/2017 | 10/10/2017 | 10/10/2017 1:23:38 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by JANET TATILIAN
|
PLM17-03659
| Final | 10/5/2017 | 10/10/2017 | 10/10/2017 12:11:06 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
PLM16-02666
| Final | 10/9/2017 | 10/10/2017 | 10/10/2017 11:28:56 AM | A | PASS |
|
|
Scott-call when on your way to meet for access Phone #: ###-####. Tile shower is not complete. All plumbing is installed to code
|
PLM17-03899
| Plumbing Rough-in | 10/9/2017 | 10/10/2017 | 10/10/2017 10:57:54 AM | A | FAIL |
|
|
customer is traci english ###-####608 Phone #: ###-#### Inspection requested via web by niall magill. Hot and cold water lines are crossed to the water heater
|
PLM17-03897
| Water and/or Sewer | 10/9/2017 | 10/10/2017 | 10/10/2017 10:33:11 AM | A | PASS |
|
|
Should be ready by 9:30 am Phone #: ###-#### Inspection requested via web by steve bruneel
|
PLM17-03897
| DOC - Permit Finaled | 10/10/2017 | 10/10/2017 | 10/10/2017 10:32:27 AM | P | PASS |
|
|
|
PLM17-03701
| Final | 10/10/2017 | 10/10/2017 | 10/10/2017 9:52:34 AM | A | FAIL |
|
|
Install a tempering valve to control the water temperature to 120 degrees max.
|
PLM17-03701
| Final | 10/9/2017 | 10/10/2017 | 10/10/2017 9:50:07 AM | A | CANC |
|
|
Chris Phone #: ###-####. Install a tempering valve to control the temperature to a maximum of 120 degrees. ispc 413.1
|
PLM17-03294
| Final | 10/9/2017 | 10/10/2017 | 10/10/2017 9:04:17 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers. Cracked wc bowl
|
PLM17-02703
| Final | 10/9/2017 | 10/10/2017 | 10/10/2017 8:53:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Branden Steers
|
PLM17-00977
| PLM-Aging Inspection | 10/10/2017 | 10/10/2017 | 10/10/2017 8:13:46 AM | | PASS |
|
|
|
PLM17-00977
| DOC - Permit Finaled | 10/10/2017 | 10/10/2017 | 10/10/2017 8:13:33 AM | P | PASS |
|
|
|