ELE18-03889
| Conference | 10/10/2018 | 10/10/2018 | 10/10/2018 1:52:03 PM | P | DONE |
|
|
Lucas Phone #: ###-#### Discussed overhead mast with a couple of 45's to avoid exterior attic access. Also discussed bonding hot and cold under kitchen sink. Water heater was changed to poly. There is no crawl space. Do not know where main comes in. Kitchen sink is only available spot.
|
ELE18-01694
| Electrical Rough-In | 10/10/2018 | 10/10/2018 | 10/10/2018 1:40:19 PM | P | PASS |
|
|
Derrick Kamper is on site contact Phone #: ###-#### Inspection requested via web by Deb Gooden Ok cover ceiling in basement area.
|
ELE18-03524
| Final | 10/10/2018 | 10/10/2018 | 10/10/2018 1:19:22 PM | P | NH |
|
|
The gate is unlocked on the right side of the house. There aren’t any animals. I apologize there is a little bit of mud left over from the trench digging. But you should find everything in order. Phone #: ###-#### Inspection requested via web by Craig Korell Knocked on door no answer. Talked to Craig, he is going to coordinate a time to meet and do final inspection.
|
ELE18-03688
| Electrical Rough-In | 10/10/2018 | 10/10/2018 | 10/10/2018 12:45:15 PM | P | CANC |
|
|
Mucho Phone #: ###-#### I added a p/s. No rough-in.
|
ELE18-03688
| Permanent Service | 10/10/2018 | 10/10/2018 | 10/10/2018 12:44:45 PM | P | PASS |
|
|
2 grd rods. p/s u/g n ok
|
ELE18-03840
| Permanent Service | 10/8/2018 | 10/10/2018 | 10/10/2018 11:34:11 AM | P | PASS |
|
|
Mitch-please call 30 minutes prior Phone #: ###-#### p/s u/g rec ok
|
ELE18-03624
| Final | 10/9/2018 | 10/10/2018 | 10/10/2018 11:21:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey Ok final. DW unit is hard wired, on a 2 pole 20a.
|
ELE18-03885
| Temporary Service | 10/10/2018 | 10/10/2018 | 10/10/2018 10:08:35 AM | A | PASS |
|
|
Temp power pole inspection only. I will be there shortly with two blanks for the panel. Call if any other problems. Phone #: ###-#### Inspection requested via web by John Harvey t/s o/h n ok.
|
ELE17-03804
| Final | 10/8/2018 | 10/10/2018 | 10/10/2018 10:07:25 AM | A | PASS |
|
|
Mitch Phone #: ###-#### Ok final.
|
ELE18-02719
| Final | 10/9/2018 | 10/10/2018 | 10/10/2018 10:02:46 AM | A | PASS |
|
|
Please call Richard (###-####) ahead for access Phone #: ###-#### Inspection requested via web by Brad Girard Ok final
|
ELE14-00613
| ELE-Aging Inspection | 10/10/2018 | 10/10/2018 | 10/10/2018 7:14:52 AM | | DONE |
|
|
Please schedule a final inspection.
|
ELE14-00670
| ELE-Aging Inspection | 10/10/2018 | 10/10/2018 | 10/10/2018 7:14:16 AM | | DONE |
|
|
Please schedule a final inspection.
|
ELE18-03885
| Temporary Service | 10/10/2018 | 10/10/2018 | 10/10/2018 7:13:50 AM | A | CANC |
|
|
Temp power pole inspection only. Call if any problems with the service. Phone #: ###-#### >> Inspection requested via web by John Harvey Inspection cancelled from web by: John Harvey
|