Inspections for the day of: Thursday, October 10, 2019.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJames Ady
TitleELE-INSPECTOR
Phone #914-4683
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-03833 Electrical Rough-In10/9/201910/10/201910/10/2019 2:28:34 PMPPASS
after 130 // Daniel Phone #: ###-#### Laundry room walls only ok to cover
ELE19-01403 Electrical Rough-In10/9/201910/10/201910/10/2019 2:00:24 PMPPASS
Contact John for level 1 ramp #2 rough in. Phone #: ###-#### Inspection requested via web by Tom Betty level 1 ramp 2 pour only ok to cover
ELE19-03877 Final10/9/201910/10/201910/10/2019 1:59:22 PMPPASS
Thomas Phone #: ###-#### All work is surface mounted. 220v for oven and mini plit as well as 110v gfci receptacle. Final ok
ELE19-03877 Conference10/9/201910/10/201910/10/2019 1:08:20 PMPPASS
Thomas Phone #: ###-#### Work has been done. All work was surface maounted. no conference needed
ELE19-03910 Electrical Rough-In10/10/201910/10/201910/10/2019 12:46:36 PMPPASS
Please call the office to have someone meet you there. 30 minute heads up. Call the office at ###-#### Phone #: ###-#### Inspection requested via web by Clayton Morgan Kitchen only. ok to cover (talked about GFCI location for plug mold under cabinets. Needs to be readily accessable. Will do GFCI breakers)
ELE17-01101 ELE-Aging Inspection10/10/201910/10/201910/10/2019 11:06:40 AM DONE
Still waiting on contractor no final has been scheduled.
ELE17-01112 ELE-Aging Inspection10/10/201910/10/201910/10/2019 11:06:06 AM FAIL
No corrections have been made at this time. No final has been scheduled
ELE19-03834 Electrical Rough-In10/10/201910/10/201910/10/2019 11:04:54 AMAPASS
Conduit laid in ground and waiting to get okay to bury Phone #: ###-#### Inspection requested via web by Paul Stewart Underground from disc. to new A/C location only ok to cover
ELE19-03857 Conference10/8/201910/10/201910/10/2019 9:58:21 AMAPASS
I believe this is for the planning / pre-work discussion. Phone #: ###-#### Inspection requested via web by Ron Jones Talked about wire size, GFCI location, Sch80 above ground, THHN in conduit and when to call for inspection.
ELE19-03052 Electrical Rough-In10/10/201910/10/201910/10/2019 9:30:31 AMAPASS
Floor heat mst bath insp Phone #: ###-#### Inspection requested via web by John VanZandt Master floor heat only. Ok to cover (Note: previous inspection was edited wrong. Should have read" Kitchen, master bed cans and master bath ok to cover")
ELE19-03856 Rough-In Permanent Service10/9/201910/10/201910/10/2019 8:51:26 AMAPASS
Damion Phone #: ###-#### 2in conduit from existing overhead service to back of N. Modular building and future service location as well as 2 2in conduits from ID power pole to same location. Underground only ok to cover.
ELE19-03874 Temporary Service10/9/201910/10/201910/10/2019 8:37:50 AMAPASS
Phone #: ###-#### Inspection requested via web by Ryan Wake t/s o/h n ok