ELE19-03833
| Electrical Rough-In | 10/9/2019 | 10/10/2019 | 10/10/2019 2:28:34 PM | P | PASS |
|
|
after 130 // Daniel Phone #: ###-#### Laundry room walls only ok to cover
|
ELE19-01403
| Electrical Rough-In | 10/9/2019 | 10/10/2019 | 10/10/2019 2:00:24 PM | P | PASS |
|
|
Contact John for level 1 ramp #2 rough in. Phone #: ###-#### Inspection requested via web by Tom Betty level 1 ramp 2 pour only ok to cover
|
ELE19-03877
| Final | 10/9/2019 | 10/10/2019 | 10/10/2019 1:59:22 PM | P | PASS |
|
|
Thomas Phone #: ###-#### All work is surface mounted. 220v for oven and mini plit as well as 110v gfci receptacle. Final ok
|
ELE19-03877
| Conference | 10/9/2019 | 10/10/2019 | 10/10/2019 1:08:20 PM | P | PASS |
|
|
Thomas Phone #: ###-#### Work has been done. All work was surface maounted. no conference needed
|
ELE19-03910
| Electrical Rough-In | 10/10/2019 | 10/10/2019 | 10/10/2019 12:46:36 PM | P | PASS |
|
|
Please call the office to have someone meet you there. 30 minute heads up. Call the office at ###-#### Phone #: ###-#### Inspection requested via web by Clayton Morgan Kitchen only. ok to cover (talked about GFCI location for plug mold under cabinets. Needs to be readily accessable. Will do GFCI breakers)
|
ELE17-01101
| ELE-Aging Inspection | 10/10/2019 | 10/10/2019 | 10/10/2019 11:06:40 AM | | DONE |
|
|
Still waiting on contractor no final has been scheduled.
|
ELE17-01112
| ELE-Aging Inspection | 10/10/2019 | 10/10/2019 | 10/10/2019 11:06:06 AM | | FAIL |
|
|
No corrections have been made at this time. No final has been scheduled
|
ELE19-03834
| Electrical Rough-In | 10/10/2019 | 10/10/2019 | 10/10/2019 11:04:54 AM | A | PASS |
|
|
Conduit laid in ground and waiting to get okay to bury Phone #: ###-#### Inspection requested via web by Paul Stewart Underground from disc. to new A/C location only ok to cover
|
ELE19-03857
| Conference | 10/8/2019 | 10/10/2019 | 10/10/2019 9:58:21 AM | A | PASS |
|
|
I believe this is for the planning / pre-work discussion. Phone #: ###-#### Inspection requested via web by Ron Jones Talked about wire size, GFCI location, Sch80 above ground, THHN in conduit and when to call for inspection.
|
ELE19-03052
| Electrical Rough-In | 10/10/2019 | 10/10/2019 | 10/10/2019 9:30:31 AM | A | PASS |
|
|
Floor heat mst bath insp Phone #: ###-#### Inspection requested via web by John VanZandt Master floor heat only. Ok to cover (Note: previous inspection was edited wrong. Should have read" Kitchen, master bed cans and master bath ok to cover")
|
ELE19-03856
| Rough-In Permanent Service | 10/9/2019 | 10/10/2019 | 10/10/2019 8:51:26 AM | A | PASS |
|
|
Damion Phone #: ###-#### 2in conduit from existing overhead service to back of N. Modular building and future service location as well as 2 2in conduits from ID power pole to same location. Underground only ok to cover.
|
ELE19-03874
| Temporary Service | 10/9/2019 | 10/10/2019 | 10/10/2019 8:37:50 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wake t/s o/h n ok
|