BLD99-01882
| BLD-Framing/Rough-in | 10/8/1999 | 10/11/1999 | 10/11/1999 12:00:00 AM | | PART |
|
|
bill ###-#### pouring at 8am not frame insp … masonary : ok pending spec. insp. Report.
|
BLD98-02703
| BLD-Final | 10/8/1999 | 10/11/1999 | 10/11/1999 12:00:00 AM | A | PASS |
|
|
Walgreen's, final reinspect - I have the card, Carl - Cathy ok for c/o
|
BLD99-02554
| BLD-Final | 10/8/1999 | 10/11/1999 | 10/11/1999 12:00:00 AM | A | PART |
|
|
Kainoa ###-#### shaft int. ok ; need to relocate lav. @ bath or resubmit
|
BLD99-02369
| BLD-Framing/Rough-in | 10/8/1999 | 10/11/1999 | 10/11/1999 12:00:00 AM | A | FAIL |
|
|
Larry ###-#### need shaft or data for "fire-master" (3-m) @ grease duct; cover wood @ "plenum" .
|
BLD99-01960
| BLD-Framing/Rough-in | 10/8/1999 | 10/11/1999 | 10/11/1999 12:00:00 AM | A | FAIL |
|
|
Don ###-#### c/n : temp . Gladd, demising wall, vapor barrier; ok to cover walls
|
BLD99-01410
| BLD-Framing/Rough-in | 10/8/1999 | 10/11/1999 | 10/11/1999 12:00:00 AM | P | FAIL |
|
|
pat ###-#### C/N: Fastener spacing; need eng's clarification for shear wall construction.
|
BLD99-01882
| BLD-Framing/Rough-in | 10/11/1999 | 10/11/1999 | 10/11/1999 12:00:00 AM | P | PART |
|
|
Bill ###-#### masonary/ grout… pend. Spec. insp. Report
|
BLD99-01767
| BLD-Final | 10/11/1999 | 10/11/1999 | 10/11/1999 12:00:00 AM | P | PASS |
|
|
cecil ###-#### fn occ insp
|
BLD99-01043
| BLD-Framing/Rough-in | 10/11/1999 | 10/11/1999 | 10/11/1999 12:00:00 AM | P | PART |
|
|
mitch--- ###-#### fr insp Column supports for steel I-Beam only.
|
MEC99-03312
| Pressure Test | 10/11/1999 | 10/11/1999 | 10/11/1999 12:00:00 AM | P | FAIL |
|
|
will ###-#### pres test Not home, recall
|
BLD98-02525
| BLD-Conference | 10/12/1999 | 10/11/1999 | 10/11/1999 12:00:00 AM | P | PART |
|
|
has hold per Cathy W. will meet w/ contractor
|