Inspections for the day of: Friday, October 11, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02402 BLD-Footing10/10/200210/11/200210/11/2002 12:00:00 AMAPASS
CHRIS; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD02-01999 BLD-Framing/Rough-in10/10/200210/11/200210/11/2002 12:00:00 AMAPART
TIE DOWN INSPECT AS WELL FOR PORTABLE CLASSROOM ###-#### PETE Tie downs and support OK...Frame for ramp and stairway OK...Advised that stairs will not comply (no decking installed yet).....Call anytime for conf. if questions. 10/11/2002 9:12:30 AM
BLD02-01189 BLD-Other10/10/200210/11/200210/11/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/10/2002 at 16:29:25. Contact: ###-####. Advised......Need all trade rough-in approvals prior to calling for frame insp. 10/11/2002 9:52:05 AM
MEC02-02118 Pressure Test10/10/200210/11/200210/11/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/10/2002 at 17:45:48. Contact: ###-####.
BLD02-02300 BLD-Foundation10/10/200210/11/200210/11/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/10/2002 at 21:56:37. Contact: ###-####.
BLD02-00431 BLD-Final10/11/200210/11/200210/11/2002 12:00:00 AMAPART
OK for Temp Occ.
BLD01-02513 BLD-Framing/Rough-in10/10/200210/11/200210/11/2002 12:00:00 AMPPART
ceiling inspection; Phone #: ###-#### Internet Inspection Request from: Amy Lawson Verbal Corridors OK... Perimeter rooms 2nd floor OK...Need seismic pod at rooms more than 144' Leave out 1 tile for insp of pod. 10/11/2002 1:12:17 PM
MEC02-02160 Final10/11/200210/11/200210/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/11/2002 at 08:22:44. Contact: ###-####.
MEC02-02923 Rough-in10/11/200210/11/200210/11/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/11/2002 at 08:24:50. Contact: ###-####. F/P....OK FINAL OK. 10/11/2002 1:29:29 PM
BLD02-00431 BLD-Framing/Rough-in10/11/200210/11/200210/11/2002 12:00:00 AMPPASS
CALL DAVID FIRST ; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung should be final....Temp OK. 10/11/2002 11:52:59 AM