MEC02-02652
| Rough-in | 10/10/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC02-02652
| Pressure Test | 10/10/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | A | FAIL |
|
|
###-#### C/N posted--only 15 lbs on guage. 10/11/2002 9:07:18 AM
|
MEC02-02889
| Rough-in | 10/11/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/11/2002 at 05:11:22. Contact: ###-####.
|
BLD02-01774
| BLD-Framing/Rough-in | 10/11/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/11/2002 at 05:32:26. Contact: ###-####. Ext. shear ok--interior osb shear not completed--provide eng. or install interior shear by framing inspection. 10/11/2002 10:19:16 AM
|
BLD02-01282
| BLD-Energy code compliance | 10/10/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | A | FAIL |
|
|
rj smith; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Framing on detached garage not energy--C/n posted upstairs--detached garage window. 10/11/2002 10:17:59 AM
|
BLD02-01329
| BLD-Final | 10/10/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | A | FAIL |
|
|
terry access code 193 to lock box ; Phone #: ###-#### Internet Inspection Request from: Annette Moore C/N Tempered glass required within 24" of patio door. 10/11/2002 11:01:44 AM
|
BLD02-02031
| BLD-Framing/Rough-in | 10/10/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/10/2002 at 13:19:09. Contact: ###-####. SHEAR--Ok to side 10/11/2002 12:05:48 PM
|
BLD02-01737
| BLD-Framing/Rough-in | 10/10/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | P | NR |
|
|
###-#### randy NO INSPECTION PERFORMED--C/N issued--Pass pressure test needed and air seal package not done--Complete these two items and re-call for frame inspection. 10/11/2002 1:48:07 PM
|
BLD02-02020
| BLD-Framing/Rough-in | 10/9/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | P | PART |
|
|
###-#### SHEAR NAILING Ok to side 10/11/2002 2:57:52 PM
|
MEC02-02059
| Final | 10/11/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD02-02358
| BLD-Footing | 10/11/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson wip--5% ready at time of inspection. 10/11/2002 3:39:05 PM
|
BLD02-02333
| BLD-Foundation | 10/11/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Amy Lawson Already poured 10/11/2002 1:27:42 PM
|
MEC02-02937
| Rough-in | 10/11/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/11/2002 at 08:59:28. Contact: ###-####.
|
MEC02-02666
| Rough-in | 10/11/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/11/2002 at 10:38:13. Contact: ###-####.
|
MEC02-02951
| Rough-in | 10/11/2002 | 10/11/2002 | 10/11/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/11/2002 at 11:16:38. Contact: ###-####.
|