ESC05-01563
| Tracking Control | 9/27/2005 | 10/11/2005 | 10/13/2005 1:44:53 PM | A | PASS |
|
|
Site looks fine.
|
ESC05-01181
| Random Inspection | 10/11/2005 | 10/11/2005 | 10/11/2005 3:10:24 PM | P | PASS |
|
|
Site looks good. Spoke with RP about watching trackout off of sites.
|
ESC04-01295
| Random Inspection | 10/11/2005 | 10/11/2005 | 10/11/2005 3:10:12 PM | P | PASS |
|
|
Site looks good. Spoke with RP about watching trackout off of sites.
|
ESC04-01021
| DOC - Permit Finaled | 10/11/2005 | 10/11/2005 | 10/11/2005 3:09:30 PM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC05-01145
| DOC - Permit Finaled | 10/11/2005 | 10/11/2005 | 10/11/2005 3:09:09 PM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC03-00725
| DOC - Permit Finaled | 10/11/2005 | 10/11/2005 | 10/11/2005 3:08:47 PM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC03-00957
| DOC - Permit Finaled | 10/11/2005 | 10/11/2005 | 10/11/2005 3:08:23 PM | P | PASS |
|
|
Final stabilization has been completed.
|
ESC05-01417
| Site Preparation | 10/10/2005 | 10/11/2005 | 10/11/2005 1:19:12 PM | A | FAIL |
|
|
verbal c/n to RP. Streets and gutters in entire subdivision need to be swept and maintained. Will be completed by Friday 10-14-05.
|
ESC05-01364
| Random Inspection | 9/27/2005 | 10/11/2005 | 10/11/2005 1:16:47 PM | A | FAIL |
|
|
verbal c/n to RP. Streets and gutters in entire subdivision need to be swept and maintained. Will be completed by Friday 10-14-05.
|
ESC05-01171
| Random Inspection | 9/27/2005 | 10/11/2005 | 10/11/2005 1:16:28 PM | A | FAIL |
|
|
verbal c/n to RP. Streets and gutters in entire subdivision need to be swept and maintained. Will be completed by Friday 10-14-05.
|
ESC05-01170
| Random Inspection | 9/27/2005 | 10/11/2005 | 10/11/2005 1:16:15 PM | A | FAIL |
|
|
verbal c/n to RP. Streets and gutters in entire subdivision need to be swept and maintained. Will be completed by Friday 10-14-05.
|
ESC05-00458
| Random Inspection | 9/27/2005 | 10/11/2005 | 10/11/2005 1:15:59 PM | A | FAIL |
|
|
verbal c/n to RP. Streets and gutters in entire subdivision need to be swept and maintained. Will be completed by Friday 10-14-05.
|
ESC05-01174
| Random Inspection | 9/27/2005 | 10/11/2005 | 10/11/2005 1:15:44 PM | A | FAIL |
|
|
verbal c/n to RP. Streets and gutters in entire subdivision need to be swept and maintained. Will be completed by Friday 10-14-05.
|
ESC05-00604
| Random Inspection | 9/27/2005 | 10/11/2005 | 10/11/2005 1:15:22 PM | A | FAIL |
|
|
verbal c/n to RP. Streets and gutters in entire subdivision need to be swept and maintained. Will be completed by Friday 10-14-05.
|
ESC05-01453
| Random Inspection | 9/27/2005 | 10/11/2005 | 10/11/2005 1:14:53 PM | A | FAIL |
|
|
verbal c/n to RP. Streets and gutters in entire subdivision need to be swept and maintained. Will be completed by Friday 10-14-05.
|
ESC05-00508
| BMP Violation | 10/11/2005 | 10/11/2005 | 10/11/2005 8:59:14 AM | P | FAIL |
|
|
c/n issued to Contractor to address heavy trackout and sediment on sidewalks and parking lot . access control is needed to prevent traffic from entering site where bare soil is. contacted RP.
|
ESC05-00713
| Tracking Control | 10/11/2005 | 10/11/2005 | 10/11/2005 8:24:29 AM | P | PART |
|
|
verbal c/n to RP. Sidewalks and gutters need attention to address sediment.
|
ESC05-00709
| Tracking Control | 10/11/2005 | 10/11/2005 | 10/11/2005 8:24:13 AM | P | PART |
|
|
verbal c/n to RP. Sidewalks and gutters need attention to address sediment.
|