FIR07-00325
| FIR-Aging Inspection | 10/11/2007 | 10/11/2007 | 10/12/2007 4:40:54 PM | | PART |
|
|
wip
|
BLD07-02515
| FIRE-Final Inspection | 10/11/2007 | 10/11/2007 | 10/11/2007 3:22:14 PM | P | PASS |
|
|
|
BLD07-00957
| FIRE-Final Inspection | 10/10/2007 | 10/11/2007 | 10/11/2007 3:19:46 PM | A | PASS |
|
|
tested rollup fire door, completed fire life safety.
|
FIR07-00799
| INSP-Final Inspection | 10/11/2007 | 10/11/2007 | 10/11/2007 2:52:41 PM | P | PASS |
|
|
Picked up air balance report, All other corrections per Forrest inspection have been met.
|
FIR05-00536
| INSP-Sprinkler Rough-in | 10/11/2007 | 10/11/2007 | 10/11/2007 2:23:33 PM | P | PART |
|
|
OK to cover 9th floor eyebrow
|
BLD06-03139
| FIRE-Final Inspection | 10/11/2007 | 10/11/2007 | 10/11/2007 1:38:40 PM | P | PASS |
|
|
fire final
|
BLD07-00694
| FIRE-Final Inspection | 10/10/2007 | 10/11/2007 | 10/11/2007 12:01:39 PM | A | PASS |
|
|
no issues noted.
|
BLD07-00922
| FIRE-Final Inspection | 10/9/2007 | 10/11/2007 | 10/11/2007 10:19:47 AM | A | PASS |
|
|
All corrections were made per forrest notes
|
FIR07-00808
| INSP-Final Inspection | 10/10/2007 | 10/11/2007 | 10/11/2007 9:28:00 AM | A | PASS |
|
|
check two sprinkler heads that were relocated,to new plans
|