BLD12-03195
| FIRE-Final Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 3:36:15 PM | P | PASS |
|
|
life safety passed
|
BLD13-02082
| FIRE-Final Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 3:25:30 PM | P | PASS |
|
|
life safety passed
|
BLD13-02662
| FIRE-Final Inspection | 10/10/2013 | 10/11/2013 | 10/11/2013 3:15:15 PM | P | FAIL |
|
|
Provide single action hardware for the main exit, provide correct size fire extinguisher with current inspection tag and provide new address numbers that are 4" min. as discussed.
|
BLD13-00645
| FIRE-Conference | 10/10/2013 | 10/11/2013 | 10/11/2013 3:09:39 PM | A | DONE |
|
|
Greg Baisch and I discussed the placement of the exit signs that may be blocked by ducting and the need for the fire hydrant to be rotated so that the 5" barrel does not face a parking space.
|
FIR13-00374
| INSP-Final Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 3:01:46 PM | P | PASS |
|
|
Permit finaled
|
FIR13-00495
| INSP-Final Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 1:51:36 PM | P | PASS |
|
|
Permit finaled.
|
FIR13-00338
| INSP-Final Inspection | 10/10/2013 | 10/11/2013 | 10/11/2013 12:54:50 PM | A | PASS |
|
|
Permit finaled. Forward flush passed.
|
BLD13-01323
| FIRE-Final Inspection | 10/10/2013 | 10/11/2013 | 10/11/2013 12:52:30 PM | A | FAIL |
|
|
Smoke alarms need to be located no closer than 3' from bathrooms with a shower or tub. This happens in three apartments. Post signage on riser room door.
|
FIR13-00441
| INSP-Sprinkler Rough-in | 10/10/2013 | 10/11/2013 | 10/11/2013 10:37:13 AM | A | PASS |
|
|
Mezzanine piping is ok to cover.. I noted that light fixtures may block pendant heads based on flex/wiring locations next to pendants.
|
FIR13-00505
| INSP-Sprinkler Rough-in | 10/10/2013 | 10/11/2013 | 10/11/2013 10:34:39 AM | A | PASS |
|
|
See the city approved plans for restroom piping that is ok to cover
|
BLD13-02441
| FIRE-Final Inspection | 10/9/2013 | 10/11/2013 | 10/11/2013 9:39:20 AM | A | PASS |
|
|
Life safety passed. I spoke to Tim about the need to maintain a 6" flue space within the rachking and he also agreed to remove the solid shelving. Also per TIm the racking not shown on the plans is an assembly area and is temporary as well.
|
FIR13-00342
| INSP-Sprinkler Rough-in | 10/10/2013 | 10/11/2013 | 10/11/2013 8:01:29 AM | A | PASS |
|
|
rough-in and tenting inspection passed. Piping can be covered.
|
FIR13-00280
| INSP-Final Inspection | 10/10/2013 | 10/11/2013 | 10/10/2013 2:00:25 PM | A | CANC |
|
|
Please call Jeremy at ###-#### with inspection time Phone #: ###-#### >> Inspection requested via web by Lori Brungardt Inspection cancelled from web by: Lori Brungardt
|