BLD13-01288
| BLD-Wall cover | 10/11/2013 | 10/11/2013 | 10/11/2013 4:17:29 PM | A | NR |
|
|
|
BLD13-01288
| BLD-Wall cover | 10/11/2013 | 10/11/2013 | 10/11/2013 4:15:51 PM | P | PART |
|
|
1st. floor east units ok. Middle units 2nd floor ok, for face layers on floor ceiling assemblies and 1st. floor middle units.
|
BLD13-02441
| BLD-Final | 10/9/2013 | 10/11/2013 | 10/11/2013 2:39:29 PM | P | PASS |
|
|
call 30 min before // Jeff Phone #: ###-####
|
BLD13-02441
| DOC - Permit Finaled | 10/11/2013 | 10/11/2013 | 10/11/2013 2:39:13 PM | P | PASS |
|
|
|
BLD13-01604
| BLD-Final | 10/11/2013 | 10/11/2013 | 10/11/2013 1:58:41 PM | P | NR |
|
|
Justin Phone #: ###-####. Needs plumbing final.
|
ESC13-00237
| Random Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 10:36:32 AM | A | PASS |
|
|
|
BLD13-00551
| BLD-Energy code compliance | 10/10/2013 | 10/11/2013 | 10/11/2013 10:35:56 AM | A | PASS |
|
|
Contact Brian Phone #: ###-#### >> Inspection requested via web by James Larkin
|
BLD13-02592
| BLD-Conference | 10/10/2013 | 10/11/2013 | 10/11/2013 10:31:43 AM | A | DONE |
|
|
Phone #: ###-#### >> Inspection requested via web by Sandra Daffer
|
BLD13-02592
| DOC - Permit Finaled | 10/11/2013 | 10/11/2013 | 10/11/2013 10:31:17 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
GCB13-00044
| GCB-Final | 10/10/2013 | 10/11/2013 | 10/11/2013 9:20:08 AM | P | FAIL |
|
|
Brayden ###-#### Call first. Needs to provide the blower door test results and post or the 3rd. party airseal inspection report. Also needs to post the required energy cert. information and post.
|
GCB13-00124
| GCB-Footing | 10/10/2013 | 10/11/2013 | 10/11/2013 8:30:30 AM | A | DONE |
|
|
Chuck ###-####- New site plans with 5' setback has been approved. Set back was approved.
|