ESC13-00331
| Aging Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 12:15:02 PM | | PASS |
|
|
WIP - working on rear garage. No trackout, activity contained within landscaped yard. Approved.
|
ESC13-00326
| Aging Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 12:05:19 PM | | PART |
|
|
Addition in progress to garage. No work along 22nd Street - work is in alleyway. No ESC violations or trackout, but need to put permit details on permit sign. Left written correction notice.
|
ESC13-00250
| General Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 11:41:10 AM | | PASS |
|
|
No changes since prior inspection. Disturbed earth is stabilized by pit run, but there is still disturbed earth surrounded by asphalt parking lot. People are driving on the dirt bringing some track out.. Need to discuss whether permit should be finaled.
|
ESC13-00215
| General Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 11:24:14 AM | | PART |
|
|
No ESC violations at this time and subdivision development appears complete. Vacant lots have not been stabilized, need to check if any BLD permits have been issued for the new plots. Will discuss plans and stabilization with RP Kent.
|
ESC13-00701
| General Inspection | 10/11/2013 | 10/11/2013 | 10/11/2013 10:59:10 AM | | PASS |
|
|
Wattles in place to protect disturbed area. No trackout or other violations at time of inspection. WIP; approved.
|
ESC13-00823
| DOC - Permit Finaled | 10/11/2013 | 10/11/2013 | 10/11/2013 10:20:07 AM | P | PASS |
|
|
Finaled.
|
ESC13-01014
| Site Preparation | 10/10/2013 | 10/11/2013 | 10/11/2013 10:01:54 AM | A | PASS |
|
|
Sam or Rick Phone #: ###-####
BMPs include wattle to protect rocky swale stormwater feature, construction fence to secure area, construction entrance, and cement washout. Performed walkthrough with Black Eagle rep Samantha (Sam) who has ESC plan onsite. Approved.
|