BLD16-01125
| BLD-Framing/Rough-in | 10/5/2016 | 10/5/2016 | | P | |
|
|
Chris Phone #: ###-####
|
BLD16-01125
| BLD-Conference | 10/5/2016 | 10/6/2016 | | A | |
|
|
John Phone #: ###-####
|
MIS16-00106
| MIS-Aging Inspection | 10/11/2016 | 10/11/2016 | 10/17/2016 12:31:15 PM | | CANC |
|
|
|
BLD16-03211
| BLD-Framing/Rough-in | 10/10/2016 | 10/11/2016 | 10/12/2016 9:45:16 AM | P | PASS |
|
|
Jeff Phone #: ###-####
|
ESC16-00789
| Site Final | 10/11/2016 | 10/11/2016 | 10/11/2016 2:26:12 PM | P | PASS |
|
|
|
ESC16-00789
| DOC - Permit Finaled | 10/11/2016 | 10/11/2016 | 10/11/2016 2:26:02 PM | P | PASS |
|
|
|
BLD16-02379
| BLD-Wall Bracing | 10/11/2016 | 10/11/2016 | 10/11/2016 2:25:30 PM | P | PASS |
|
|
Bill Phone #: ###-####
|
BLD16-03198
| BLD-Footing | 10/10/2016 | 10/11/2016 | 10/11/2016 2:25:06 PM | P | PASS |
|
|
Eric Phone #: ###-####
|
BLD16-02076
| BLD-Energy code compliance | 10/11/2016 | 10/11/2016 | 10/11/2016 2:24:33 PM | P | PASS |
|
|
Brett Phone #: ###-####
|
BLD16-02115
| BLD-Final | 10/10/2016 | 10/11/2016 | 10/11/2016 12:52:30 PM | A | NH |
|
|
holly Phone #: ###-####
|
BLD16-00732
| BLD-Framing/Rough-in | 10/10/2016 | 10/11/2016 | 10/11/2016 10:55:39 AM | A | PART |
|
|
Pat Phone #: ###-#### center (3) units.....OK.
|
BLD16-03601
| BLD-Footing | 10/10/2016 | 10/11/2016 | 10/11/2016 10:54:55 AM | A | PASS |
|
|
This footing inspection can be done in the late AM tomorrow. Aaron will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
BLD16-03669
| BLD-Foundation | 10/10/2016 | 10/11/2016 | 10/11/2016 9:42:14 AM | A | PASS |
|
|
Larry-pour time 11:00 Phone #: ###-####
|