ELE16-01838
| Conference | 10/11/2016 | 10/11/2016 | 10/11/2016 3:52:08 PM | P | DONE |
|
|
ceiling on level 4 of Annex tiles dropped in prior to inspection. Request onsite visit for direction. call John Phone #: ###-#### Inspection requested via web by Brandon Robinson Called to discuss if kitchen area grid ok as is. Tiles installed prior to inspection. See rough in notes.
|
ELE16-01838
| Electrical Rough-In | 10/11/2016 | 10/11/2016 | 10/11/2016 3:50:28 PM | P | FAIL |
|
|
ceiling on level 4 of Annex tiles dropped in prior to inspection. Request onsite visit for direction. call John Phone #: ###-#### Inspection requested via web by Brandon Robinson Contractor did not request inspection for kitchen area in Annex 4th floor. Grid tiles installed prior to inspection. Equipment hook ups not complete, lighting, junctions, and pull points not complete and cannot see if some areas are complete. Remove ALL ceiling grid tiles for inspection. When work complete contractor will request inspection for this area.
|
ELE16-02525
| Final | 10/11/2016 | 10/11/2016 | 10/11/2016 3:27:56 PM | P | PASS |
|
|
Calvin will be there. Thank you!! Phone #: ###-#### Inspection requested via web by Clay Morgan Final ok
|
ELE16-03309
| Electrical Rough-In | 10/11/2016 | 10/11/2016 | 10/11/2016 3:27:31 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by steve ragan Space marked 1800. Wall separating spaces and conference room wall rough in ok cover. ceilings to remain from existing.
|
ELE16-01946
| Electrical Rough-In | 10/11/2016 | 10/11/2016 | 10/11/2016 3:26:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Basement storage walls and ceilings, 2nd floor soffits all as noted on contractor print.
|
ELE15-00495
| Conference | 10/11/2016 | 10/11/2016 | 10/11/2016 3:23:15 PM | P | DONE |
|
|
Talk about items required to get a final on Core and Shell. Contact Toby Groves ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves Will reschedule for tomorrow.
|
ESC16-01231
| Random Inspection | 10/11/2016 | 10/11/2016 | 10/11/2016 12:27:22 PM | P | PASS |
|
|
Trash contained clean site
|
ESC16-01194
| Random Inspection | 10/11/2016 | 10/11/2016 | 10/11/2016 12:26:00 PM | P | PASS |
|
|
Clean job site trash contained
|
ESC16-01019
| Random Inspection | 10/11/2016 | 10/11/2016 | 10/11/2016 12:24:39 PM | P | PASS |
|
|
trash contained lot clean
|
ELE16-03157
| Electrical Rough-In | 10/10/2016 | 10/11/2016 | 10/11/2016 10:37:21 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kendall bender All walls rough in ok cover
|
ELE13-01291
| Electrical Rough-In | 10/10/2016 | 10/11/2016 | 10/11/2016 9:46:14 AM | A | PASS |
|
|
site underground inspection. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson Water feature area to be future inspection. Area south of Annex breezeway underground rough in ok cover
|
ELE16-02482
| Final | 10/10/2016 | 10/11/2016 | 10/11/2016 9:13:40 AM | A | PASS |
|
|
The key is on the fence, code 1225, any questions please let me know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren Still missing up bath stool fan. Unit plugs in contractor will install. Final ok
|
ELE16-01464
| Electrical Rough-In | 10/11/2016 | 10/11/2016 | 10/11/2016 8:27:44 AM | P | PASS |
|
|
Garage walls and ceiling rough in ok cover
|
ELE16-03295
| Electrical Rough-In | 10/10/2016 | 10/11/2016 | 10/11/2016 8:26:38 AM | A | PASS |
|
|
I forgot to pull my permit. Please review our Solar Rough In and Final out the permit. Call me if you would like me to meet you onsite. Phone #: ###-#### Inspection requested via web by Matthew Dunay Conduit installed for future solar install rough in ok cover
|
ELE16-03295
| Final | 10/11/2016 | 10/11/2016 | 10/11/2016 8:25:48 AM | P | PASS |
|
|
I forgot to pull my permit. Please review our Solar Rough In and Final out the permit. Call me if you would like me to meet you onsite. Phone #: ###-#### Inspection requested via web by Matthew Dunay Conduit installed from roof to west wall for future solar install. A seperate permit required when solar is installed. Final ok
|
ELE16-01838
| Conference | 10/10/2016 | 10/11/2016 | 10/11/2016 7:12:10 AM | A | CANC |
|
|
Level 4 Annex ceiling was installed prior to inspection. call Brandon Phone #: ###-#### >> Inspection requested via web by Brandon Robinson Inspection cancelled from web by: Brandon Robinson
|