Inspections for the day of: Tuesday, October 11, 2016.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-01838 Conference10/11/201610/11/201610/11/2016 3:52:08 PMPDONE
ceiling on level 4 of Annex tiles dropped in prior to inspection. Request onsite visit for direction. call John Phone #: ###-#### Inspection requested via web by Brandon Robinson
Called to discuss if kitchen area grid ok as is. Tiles installed prior to inspection. See rough in notes.
ELE16-01838 Electrical Rough-In10/11/201610/11/201610/11/2016 3:50:28 PMPFAIL
ceiling on level 4 of Annex tiles dropped in prior to inspection. Request onsite visit for direction. call John Phone #: ###-#### Inspection requested via web by Brandon Robinson
Contractor did not request inspection for kitchen area in Annex 4th floor. Grid tiles installed prior to inspection. Equipment hook ups not complete, lighting, junctions, and pull points not complete and cannot see if some areas are complete. Remove ALL ceiling grid tiles for inspection. When work complete contractor will request inspection for this area.
ELE16-02525 Final10/11/201610/11/201610/11/2016 3:27:56 PMPPASS
Calvin will be there. Thank you!! Phone #: ###-#### Inspection requested via web by Clay Morgan Final ok
ELE16-03309 Electrical Rough-In10/11/201610/11/201610/11/2016 3:27:31 PMPPASS
Phone #: ###-#### Inspection requested via web by steve ragan
Space marked 1800. Wall separating spaces and conference room wall rough in ok cover. ceilings to remain from existing.
ELE16-01946 Electrical Rough-In10/11/201610/11/201610/11/2016 3:26:10 PMPPASS
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Basement storage walls and ceilings, 2nd floor soffits all as noted on contractor print.
ELE15-00495 Conference10/11/201610/11/201610/11/2016 3:23:15 PMPDONE
Talk about items required to get a final on Core and Shell.
Contact Toby Groves ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves
Will reschedule for tomorrow.
ESC16-01231 Random Inspection10/11/201610/11/201610/11/2016 12:27:22 PMPPASS
Trash contained clean site
ESC16-01194 Random Inspection10/11/201610/11/201610/11/2016 12:26:00 PMPPASS
Clean job site trash contained
ESC16-01019 Random Inspection10/11/201610/11/201610/11/2016 12:24:39 PMPPASS
trash contained lot clean
ELE16-03157 Electrical Rough-In10/10/201610/11/201610/11/2016 10:37:21 AMAPASS
Phone #: ###-#### Inspection requested via web by kendall bender
All walls rough in ok cover
ELE13-01291 Electrical Rough-In10/10/201610/11/201610/11/2016 9:46:14 AMAPASS
site underground inspection. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson
Water feature area to be future inspection. Area south of Annex breezeway underground rough in ok cover
ELE16-02482 Final10/10/201610/11/201610/11/2016 9:13:40 AMAPASS
The key is on the fence, code 1225, any questions please let me know, thx, TW Phone #: ###-#### Inspection requested via web by Stephen Kren
Still missing up bath stool fan. Unit plugs in contractor will install. Final ok
ELE16-01464 Electrical Rough-In10/11/201610/11/201610/11/2016 8:27:44 AMPPASS
Garage walls and ceiling rough in ok cover
ELE16-03295 Electrical Rough-In10/10/201610/11/201610/11/2016 8:26:38 AMAPASS
I forgot to pull my permit. Please review our Solar Rough In and Final out the permit. Call me if you would like me to meet you onsite. Phone #: ###-#### Inspection requested via web by Matthew Dunay
Conduit installed for future solar install rough in ok cover
ELE16-03295 Final10/11/201610/11/201610/11/2016 8:25:48 AMPPASS
I forgot to pull my permit. Please review our Solar Rough In and Final out the permit. Call me if you would like me to meet you onsite. Phone #: ###-#### Inspection requested via web by Matthew Dunay
Conduit installed from roof to west wall for future solar install. A seperate permit required when solar is installed. Final ok
ELE16-01838 Conference10/10/201610/11/201610/11/2016 7:12:10 AMACANC
Level 4 Annex ceiling was installed prior to inspection. call Brandon Phone #: ###-#### >> Inspection requested via web by Brandon Robinson Inspection cancelled from web by: Brandon Robinson