MIS16-00113
| MIS-Aging Inspection | 10/11/2016 | 10/11/2016 | 10/17/2016 1:55:52 PM | | PASS |
|
|
|
BLD16-02698
| BLD-Framing/Rough-in | 10/11/2016 | 10/11/2016 | 10/11/2016 4:58:44 PM | P | FAIL |
|
|
Eric Phone #: ###-#### needs to fire caulk floor all piping in floor
|
BLD16-00147
| BLD-Wall cover | 10/10/2016 | 10/11/2016 | 10/11/2016 4:35:45 PM | P | NR |
|
|
Cover on 3 and 4, Insulation on 5 Phone #: ###-#### Inspection requested via web by Mike Beeson
|
BLD14-03207
| BLD-Conference | 10/11/2016 | 10/11/2016 | 10/11/2016 4:34:49 PM | P | PASS |
|
|
Adam Phone #: ###-####
|
BLD16-02692
| BLD-Foundation | 10/11/2016 | 10/11/2016 | 10/11/2016 4:34:34 PM | P | PASS |
|
|
Jared Phone #: ###-####
|
BLD16-01411
| BLD-Conference | 10/10/2016 | 10/11/2016 | 10/11/2016 9:42:56 AM | A | DONE |
|
|
Mike Phone #: ###-####
|