MEC16-04519
| Final | 10/11/2016 | 10/11/2016 | 10/11/2016 3:18:10 PM | P | NH |
|
|
Please call installer, Codie 45 mins-1 hr prior to arrival Phone #: ###-#### Inspection requested via web by Kassy Goodwin Left note on door. Called the number posted and this installer did not do the job.
|
MEC16-04523
| Final | 10/11/2016 | 10/11/2016 | 10/11/2016 2:49:03 PM | P | PASS |
|
|
Inspection requested via web by MARGIE ROWE
|
MEC16-04495
| Final | 10/10/2016 | 10/11/2016 | 10/11/2016 2:28:53 PM | P | FAIL |
|
|
2 lbs system, gas pipe for pool heater Inspection requested via web by Floyd Floyd Peek Call for final when heater is connected and the regulator is installed at meter
|
MEC16-04495
| Pressure Test | 10/10/2016 | 10/11/2016 | 10/11/2016 2:27:54 PM | P | PASS |
|
|
2 lbs system, gas pipe for pool heater Inspection requested via web by Floyd Floyd Peek 60# test
|
MEC16-04474
| Pressure Test | 10/11/2016 | 10/11/2016 | 10/11/2016 2:12:16 PM | P | PASS |
|
|
Inspection requested via web by Floyd Floyd Peek 20# test
|
MEC16-04474
| Final | 10/11/2016 | 10/11/2016 | 10/11/2016 2:11:59 PM | P | PASS |
|
|
Inspection requested via web by Floyd Floyd Peek New gas line to range. Tested the whole house gas pipng at 20# test
|