FIR17-00473
| INSP-Sprinkler Rough-in | 10/10/2017 | 10/11/2017 | 10/11/2017 1:47:14 PM | P | PART |
|
|
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated the city approved drawings with pink highlighter and red ink areas approved for cover.
|
FIR17-00178
| INSP-Alarm Testing | 10/10/2017 | 10/11/2017 | 10/11/2017 10:57:22 AM | A | DONE |
|
|
Audio visual notification for Building 51.2 sections complete. Fire riser monitoring for area's associated with building 51.2 complete.
|
FIR17-00293
| INSP-Final Inspection | 10/10/2017 | 10/11/2017 | 10/11/2017 10:54:01 AM | A | PASS |
|
|
Final fire sprinkler inspection for this area of work passed/complete.
|
BLD15-03489
| FIRE-Final Inspection | 10/10/2017 | 10/11/2017 | 10/10/2017 2:26:09 PM | A | PART |
|
|
Life fire safety for level 3 TCO complete, double key deadbolts on the northwest patio's off of capitol room will stay per conversation between Dave Hannah and I, signage will need to be installed reading "Door to remain unlocked while occupied". All construction debris will need to be removed from level 3 patio area before access of personnel other than construction is allowed. Gaurds will need to be installed around fire pit areas before final C of O.
|