ELE18-00261
| Final | 10/4/2018 | 10/11/2018 | 10/11/2018 3:31:46 PM | P | PASS |
|
|
Charelene Phone #: ###-####...ok to final
|
ELE18-02953
| Permanent Service | 10/11/2018 | 10/11/2018 | 10/11/2018 2:56:21 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by cris flores... dead front needs installed at house panel before perm service can be given
|
ELE18-02300
| Electrical Rough-In | 10/11/2018 | 10/11/2018 | 10/11/2018 2:25:41 PM | P | PASS |
|
|
Rough in at one interior wall for cover so we can mount panels. Opposite side has already been inspected. Phone #: ###-#### Inspection requested via web by Jason Parke...panel rm wall...panel location
|
ELE18-03783
| Electrical Rough-In | 10/9/2018 | 10/11/2018 | 10/11/2018 1:54:23 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rob Maes...UL listing verified..60 Amp breaker installed in panel
|
ELE18-03866
| Electrical Rough-In | 10/10/2018 | 10/11/2018 | 10/11/2018 1:04:34 PM | P | PASS |
|
|
Please call Aaron Hall Phone #: ###-#### Inspection requested via web by Kevin Perez.. underground ok to cover
|
ELE18-03904
| Final | 10/11/2018 | 10/11/2018 | 10/11/2018 12:40:14 PM | P | PASS |
|
|
Robert Phone #: ###-####...ok to final
|
ELE18-03882
| Rough-In Permanent Service | 10/10/2018 | 10/11/2018 | 10/11/2018 11:16:41 AM | A | PASS |
|
|
Duplex Phone #: ###-#### Inspection requested via web by David Nelson... rough in ok to cover p/s u/g new ok...2 meters
|
ELE18-03894
| Rough-In Permanent Service | 10/10/2018 | 10/11/2018 | 10/11/2018 11:16:04 AM | A | PASS |
|
|
Duplex Phone #: ###-#### Inspection requested via web by David Nelson... rough in ok to cover p/s u/g new ok...2 meters
|
ELE18-03896
| Electrical Rough-In | 10/10/2018 | 10/11/2018 | 10/11/2018 10:34:39 AM | A | PASS |
|
|
please call one hour before inspection Phone #: ###-#### Inspection requested via web by Taras Shulga...new wall in existing covered patio..back wall 4/5 outlets...ok to cover
|
ELE18-02856
| Final | 10/10/2018 | 10/11/2018 | 10/11/2018 10:04:17 AM | A | PASS |
|
|
Louis Phone #: ###-####...ok to final
|
ELE18-03395
| Final | 10/10/2018 | 10/11/2018 | 10/11/2018 9:28:50 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn... 1..hot/neutral reverse on outlet..middle hair station 2..outlets (x 2) within 6ft of sink shall have GFI protection-pedicure rm 3..junction box or outlet box incomplete-facial rm 4..outlet within 6ft of sink shall have GFI protection-storage/dryer area sink
|
ELE18-03030
| Electrical Rough-In | 10/10/2018 | 10/11/2018 | 10/11/2018 8:53:00 AM | A | PASS |
|
|
Floor heat inspection for cover. Back slider door is open, and the addition is not connected into existing home. Phone #: ###-#### Inspection requested via web by Barbara Szurgot tile heat ok to cover
|
ELE18-03880
| Temporary Service | 10/10/2018 | 10/11/2018 | 10/11/2018 8:33:31 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Todd Hall... t/s u/g new ok
|