Inspections for the day of: Friday, October 11, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-03776 Permanent Service10/8/201910/11/201910/11/2019 2:13:11 PMPPASS
Corbin ###-#### Service Upgrade Phone #: ###-#### Inspection requested via web by Samatha Solberg 2nd grd rod was being installed. p/s o/h rec ok
ELE19-03932 Electrical Rough-In10/10/201910/11/201910/11/2019 1:54:11 PMAPASS
Phone #: ###-#### Inspection requested via web by John VanZandt Ok cover kitchen and down bath. Down bath recepts are orginal 15a circuit. Just relocating outlets.
ELE19-03050 Final10/10/201910/11/201910/11/2019 1:37:44 PMPPASS
please call 30 minutes in advance as I will be in Nampa most of the morning. Thank you. Phone #: ###-#### Inspection requested via web by Casey Fouts Ok final up bath. Can light above tub.
ELE19-03226 Electrical Rough-In10/10/201910/11/201910/11/2019 1:37:18 PMPPASS
Front entry ceiling for cover, kitchen wall for cover Phone #: ###-#### Inspection requested via web by Kory Peterson Ok cover entry ceiling and wall in big area on N side. Wall was done before but had to be redone do to added framing.
ELE19-03816 Rough-In Permanent Service10/11/201910/11/201910/11/2019 12:53:45 PMPPASS
100% ready. Thanks Phone #: ###-#### Inspection requested via web by Eric Brown Ok cover. 4 cans front, 2 cans back with fire hats installed. p/s u/g n ok
ELE16-01175 Final10/4/201910/11/201910/11/2019 11:49:29 AMPPASS
Pool Final Inspection Phone #: ###-#### Inspection requested via web by Louis Keller Ok final. 3 mini LED lights installed on N side of swim spa. Lights fall under 680.43(B)(1)(C)(2). GFI protection is provided.
ELE19-03917 Temporary Service10/10/201910/11/201910/11/2019 10:33:23 AMAPASS
Phone #: ###-#### Inspection requested via web by Todd Hall t/s u/g n ok
ELE19-00799 Final10/11/201910/11/201910/11/2019 9:44:46 AMAPASS
Contact is Bill Hines Phone #: ###-#### Inspection requested via web by Scott Campbell Ok final. GEC run with 2nd grd rod. Backfill is not done yet. Once done, grd rod will be below grade.
ELE19-01928 Final10/9/201910/11/201910/11/2019 9:25:36 AMAFAIL
Phone #: ###-#### Inspection requested via web by Marisa Weppner
1. 2 GFI's need changed to tamper resistantt
2. Top right brkr for loft is tripping.
3. Protect 12ga wire in bathroom area
4. Change single pole toggle at front door so switch sits flush with face plate.
5. Bath recept needs to be on 20a circuit. Change out light wire to 12ga, and place on 20a breaker.
6.
ELE19-03800 Electrical Rough-In10/10/201910/11/201910/11/2019 9:05:39 AMAPASS
James-lighting north retaining wall Phone #: ###-#### Ok cover retaining wall lights.