MEC98-03231
| INSP - Final | 10/9/1998 | 10/12/1998 | 10/12/1998 12:00:00 AM | P | FAIL |
|
|
Scheduled by Hello!. Contact phone is [3451992]. need wrap gas pipe at all points of entry to bldg...may need o re-do gastest if pipe dismantled.
|
MEC98-03231
| INSP - Final | 10/9/1998 | 10/12/1998 | 10/12/1998 12:00:00 AM | P | FAIL |
|
|
Scheduled by Hello!. Contact phone is [3451992]. need wrap gas pipe at all points of entry to bldg...may need o re-do gastest if pipe dismantled.
|
BLD97-03582
| INSP - Framing/Rough-in | 10/12/1998 | 10/12/1998 | 10/12/1998 12:00:00 AM | P | FAIL |
|
|
howard ###-####...need shear walls per eng'r, may have to remove fireplace to do; protect foam insul/block w/ drywall or equal; complete posts at deck & fasten hdwe; add header at mud room wall, fireblocking not complete. ok to insulate & install int shear panels.
|
BLD98-01227
| INSP - Final | 10/12/1998 | 10/12/1998 | 10/12/1998 12:00:00 AM | P | FAIL |
|
|
Scheduled by Hello!. Contact phone is [8597468]. no insp performed, need flood cert. per prevoius c/n
|
BLD98-01348
| INSP - Final | 10/9/1998 | 10/12/1998 | 10/12/1998 12:00:00 AM | P | FAIL |
|
|
DANA ###-####...no insp performed, need pub. wks. ok...regrade back yard, eng's letter, etc.
|
BLD98-01353
| INSP - Energy code compliance | 10/12/1998 | 10/12/1998 | 10/12/1998 12:00:00 AM | P | FAIL |
|
|
conf only w/ Stan Johnson...has plbg in ext walls...is marked on plans? 316 area.
|
BLD98-02012
| INSP - Framing/Rough-in | 10/12/1998 | 10/12/1998 | 10/12/1998 12:00:00 AM | P | FAIL |
|
|
conf only w/ super re truss bracing....need lateral braces in lieu of hard lid. verbal c/n.
|