BLD99-02578
| BLD-Framing/Rough-in | 10/12/1999 | 10/12/1999 | 10/12/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/12/1999 at 07:21:43. Contact: ###-####. All ok except for upper floor
|
BLD99-02266
| BLD-Wall cover | 10/8/1999 | 10/12/1999 | 10/12/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/08/1999 at 16:04:44. Contact: ###-####. Has corrections posted
|
MEC99-02864
| Final | 10/11/1999 | 10/12/1999 | 10/12/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/11/1999 at 10:09:16. Contact: ###-####. Need to seal retrurn air can and freshen air.
|
MEC99-03334
| Final | 10/11/1999 | 10/12/1999 | 10/12/1999 12:00:00 AM | P | PASS |
|
|
dick --###-#### -re-insp for fireplace only
|
BLD98-02368
| BLD-Framing/Rough-in | 10/11/1999 | 10/12/1999 | 10/12/1999 12:00:00 AM | P | FAIL |
|
|
iran cheshire ###-#### House sided with-out approval, need engineers design ok's by engineer.
|
BLD99-02035
| BLD-Final | 10/12/1999 | 10/12/1999 | 10/12/1999 12:00:00 AM | P | PASS |
|
|
Jay ###-####
|
BLD99-02099
| BLD-Footing | 10/12/1999 | 10/12/1999 | 10/12/1999 12:00:00 AM | P | PART |
|
|
###-####--danny for ft insp Footing at interior garage and front porch, ok rebar in place not required by plan.
|
BLD99-02578
| BLD-Framing/Rough-in | 10/12/1999 | 10/12/1999 | 10/12/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/12/1999 at 09:51:58. Contact: ###-####.
|
BLD99-01634
| BLD-Energy code compliance | 10/12/1999 | 10/12/1999 | 10/12/1999 12:00:00 AM | P | FAIL |
|
|
Brandon ###-#### need energy compliance report, left correction and message with contractor.
|
MEC99-01824
| Final | 10/12/1999 | 10/12/1999 | 10/12/1999 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/12/1999 at 10:39:32. Contact: ###-####. Need range and dryer vent ran.
|
BLD97-02978
| BLD-Final | 10/12/1999 | 10/12/1999 | 10/12/1999 12:00:00 AM | P | FAIL |
|
|
Jim Conger ###-#### Need electrical final.
|
BLD99-02373
| BLD-Framing/Rough-in | 10/12/1999 | 10/12/1999 | 10/12/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/12/1999 at 11:10:56. Contact: ###-####.
|
MEC99-01825
| Final | 10/11/1999 | 10/12/1999 | 10/11/1999 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 10/11/1999 at 13:28:46. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/11/1999 at 16:57:53.
|