ELE99-04118
| Electrical Rough-In | 10/11/2000 | 10/12/2000 | 10/12/2000 12:00:00 AM | A | PASS |
|
|
###-####. pool light-potting, ok. 10/12/2000 1:04:43 PM
|
ELE00-03617
| Final | 10/11/2000 | 10/12/2000 | 10/12/2000 12:00:00 AM | A | PASS |
|
|
truman ###-#### (only partial - np cement) call me jms 36 10/12/2000 7:49:48 AM6497 10/12/2000 7:56:07 AM. corrections completed as per jms. 10/12/2000 1:02:12 PM
|
ELE00-03598
| Final | 10/11/2000 | 10/12/2000 | 10/12/2000 12:00:00 AM | A | PASS |
|
|
###-####. 10/12/2000. telephone cabels pulled away from hot tub. clearances met. 1:02:38 PM 10/12/2000 1:04:10 PM
|
ELE00-03944
| Temporary Service | 10/11/2000 | 10/12/2000 | 10/12/2000 12:00:00 AM | A | PASS |
|
|
###-####. temporayr power pole. 10/12/2000 9:40:45 PM 10/12/2000 9:41:21 PM
|
ELE00-02211
| Final | 10/12/2000 | 10/12/2000 | 10/12/2000 12:00:00 AM | P | PART |
|
|
dave-- ###-#### fn . tenant space#220 only,fn. 10/12/2000 9:49:34 PM
|
ELE00-03972
| Electrical Rough-In | 10/12/2000 | 10/12/2000 | 10/12/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/12/2000 at 08:58:47. Contact: ###-####. 2nd floor, northwest corner; ele r/i. 10/12/2000 9:48:34 PM
|
ELE00-03455
| Permanent Service | 10/12/2000 | 10/12/2000 | 10/12/2000 12:00:00 AM | P | PASS |
|
|
PER SER-- JOE ###-####.service, meter/main connection to power only. 10/12/2000 9:52:00 PM
|
ELE00-03878
| Electrical Rough-In | 10/12/2000 | 10/12/2000 | 10/12/2000 12:00:00 AM | P | PASS |
|
|
conference Mark ###-####. discussed unfused service entrance conductors to future addition. 10/12/2000 9:53:55 PM
|
ELE00-03975
| Electrical Rough-In | 10/12/2000 | 10/12/2000 | 10/12/2000 12:00:00 AM | P | PART |
|
|
###-#### call 20 to 30 minutes prior to meet there and for access Inaki Eiguren or Ike. conference; service panel installation. 10/12/2000 9:52:53 PM
|