PLM01-00856
| PLM-Aging Inspection | 10/12/2001 | 10/12/2001 | 10/12/2001 12:00:00 AM | | NR |
|
|
|
PLM01-02331
| PLM-Aging Inspection | 10/12/2001 | 10/12/2001 | 10/12/2001 12:00:00 AM | | PASS |
|
|
|
PLM01-01709
| Final | 10/12/2001 | 10/12/2001 | 10/12/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/12/2001 at 07:17:17. Contact: ###-####.
|
PLM01-03207
| Med/Gas Systems | 10/11/2001 | 10/12/2001 | 10/12/2001 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 10/11/2001 1:54:34 PM end of 24 hour test west side inlets and outlets connected. 10/12/2001 11:51:12 AM
|
PLM01-03384
| Plumbing Rough-in | 10/11/2001 | 10/12/2001 | 10/12/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/11/2001 at 18:24:34. Contact: ###-####. kitchen area ri ok 10/12/2001 9:59:05 AM
|
PLM01-01096
| Final | 10/12/2001 | 10/12/2001 | 10/12/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 330 On 10/12/2001 9:22:43 AM install all equipment, cap all future inlets and outlets, dential air compressor must meet NFPA99 4-5.1.1.3 requirements, provide system certification, turn down and screen dential air inlet and dential vacuun outlet . 10/12/2001 11:50:07 AM
|
PLM01-01860
| Final | 10/12/2001 | 10/12/2001 | 10/12/2001 12:00:00 AM | P | PASS |
|
|
###-#### james
|
PLM01-03516
| Groundwork | 10/12/2001 | 10/12/2001 | 10/12/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/12/2001 at 10:28:57. Contact: ###-####. move copper/poly connection outside foundation, ok to cover waste system, leave water line exposed 10/12/2001 2:18:01 PM
|
PLM01-03468
| Plumbing Rough-in | 10/12/2001 | 10/12/2001 | 10/12/2001 12:00:00 AM | P | PASS |
|
|
###-#### LEEANN
|