Inspections for the day of: Friday, October 12, 2001.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00298 BLD-Final10/11/200110/12/200110/12/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/11/2001 at 13:28:21. Contact: ###-####. c. of c. #21608 issued. 10/12/2001 9:32:28 AM
BLD01-01811 BLD-Wall cover10/11/200110/12/200110/12/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 10/11/2001 at 13:29:52. Contact: . Performed inspection 10/11 10/11/2001 4:28:44 PM
MEC01-02509 Final10/11/200110/12/200110/12/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/11/2001 at 13:52:04. Contact: ###-####.
MEC01-02429 Final10/11/200110/12/200110/12/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/11/2001 at 14:31:35. Contact: ###-####. No access--left notification 10/12/2001 9:00:21 AM
MEC01-01898 Final10/11/200110/12/200110/12/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/11/2001 at 14:34:53. Contact: ###-####. No access--left notification 10/12/2001 8:56:29 AM
BLD01-02698 BLD-Foundation10/11/200110/12/200110/12/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/11/2001 at 15:22:10. Contact: ###-####. wip 10/12/2001 10:38:21 AM
BLD01-01129 BLD-Final10/11/200110/12/200110/12/2001 12:00:00 AMAFAIL
###-#### TROY ###-#### GARAGE CODE # 7010 ENTER c/n--could not complete inspection-h.wood floors were tacky. 10/12/2001 9:14:30 AM
BLD01-02711 BLD-Footing10/11/200110/12/200110/12/2001 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 10/11/2001 at 18:01:56. Contact: ###-####. Cancelled by contractor--not ready 10/12/2001 10:02:28 AM
BLD01-01732 BLD-Final10/12/200110/12/200110/12/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/12/2001 at 06:44:10. Contact: ###-####. c. of c. #21609 issued. 10/12/2001 9:55:58 AM
BLD01-02375 BLD-Foundation10/12/200110/12/200110/12/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/12/2001 at 06:48:47. Contact: ###-####. wip--Changed approved plans from 6" to 8" foundation wall where 2-story exist. Ok with pat--prestige per telephone. 10/12/2001 10:50:07 AM
BLD01-02711 BLD-Footing10/12/200110/12/200110/12/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/12/2001 at 08:33:15. Contact: ###-####. wip 10/12/2001 1:12:04 PM
BLD01-02404 BLD-Framing/Rough-in10/12/200110/12/200110/12/2001 12:00:00 AMPPART
SHEER WALL ###-#### MATT SHEAR--Ext. OK--inside needs inspection per plans. Ok to side. 10/12/2001 3:07:17 PM
BLD01-02409 BLD-Framing/Rough-in10/12/200110/12/200110/12/2001 12:00:00 AMPNR
###-#### Contacted contractor informed him that no electrical permit in system--Need to pull permit, get elec. inspection prior to scheduling framing. Do not insulate 10/12/2001 1:26:09 PM
BLD01-02077 BLD-Framing/Rough-in10/12/200110/12/200110/12/2001 12:00:00 AMPPART
fr insp- gary ###-#### c/n ok to insulate 10/12/2001 2:51:28 PM
BLD01-02416 BLD-Framing/Rough-in10/10/200110/12/200110/12/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/10/2001 at 07:06:29. Contact: ###-####. c/n--ok to insulate 10/12/2001 1:50:23 PM