Inspections for the day of: Tuesday, October 12, 2004.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC03-02026 Final10/11/200410/12/200410/12/2004 12:00:00 AMAPASS
###-#### - shelly - Note: please call 1/2 hr prior to inspection P/T OK. 10/12/2004 11:49:19 AM
BLD04-02046 BLD-Final10/11/200410/12/200410/12/2004 12:00:00 AMANR
please call prior to inspection jim martin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD04-01982 BLD-Framing/Rough-in10/12/200410/12/200410/12/2004 12:00:00 AMANR
Scheduled by a contractor via Hello! on 10/12/2004 at 7:16:17 AM. Need HVAC 10/12/2004 9:50:14 AM
BLD04-01975 BLD-Framing/Rough-in10/12/200410/12/200410/12/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 10/12/2004 at 7:23:05 AM. Contact: ###-####. C/N 10/12/2004 9:43:25 AM
BLD04-01536 BLD-Other10/12/200410/12/200410/12/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/12/2004 at 7:27:13 AM. Contact: ###-####.
BLD04-01918 BLD-Conference10/12/200410/12/200410/12/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/12/2004 at 8:25:37 AM. Contact: ###-####. Do grid ceiling per appr plan Old way) 10/12/2004 5:08:34 PM
BLD04-01651 BLD-Framing/Rough-in10/12/200410/12/200410/12/2004 12:00:00 AMPNR
mary ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 10/12/2004 12:48:03 PM
BLD04-02226 BLD-Final10/12/200410/12/200410/12/2004 12:00:00 AMPNR
russell; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Need Fire final. 10/12/2004 2:06:48 PM
MEC04-02469 Final10/12/200410/12/200410/12/2004 12:00:00 AMPNH
BJ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore No one at home and no instructions for access....or instruct to call 1st. left note. Austin Cr.....L Rosepoint L Royal Park.

10/12/2004 2:44:33 PM 10/12/2004 2:45:56 PM
MIS04-00275 BLD-Conference10/12/200410/12/200410/12/2004 12:00:00 AMPFAIL
Lane the complaint is as follows......Fire Department did an inspection at this location and noticed that a shelf needed to be secured to floor. Tim Monroe with K-Mart was told to call us to set up for a building inspection at ###-####. Thanks Lane Met with Tim (###-####) and left a C/N.... Contact PDS dept and obtain building permit for 12' high racking installed in storage room. 10/13/2004 2:54:47 PM
MEC04-01938 Final10/12/200410/12/200410/12/2004 12:00:00 AMPPASS
BLD04-01974 BLD-Framing/Rough-in10/11/200410/12/200410/12/2004 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/11/2004 at 6:45:44 AM. C/N 10/12/2004 2:32:51 PM
BLD04-00908 BLD-Final10/11/200410/12/200410/12/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/11/2004 at 12:11:15 PM. Contact: ###-####. C/C issued. 10/12/2004 3:07:19 PM