ELE06-01356
| Final | 10/12/2006 | 10/12/2006 | 10/12/2006 3:59:59 PM | P | NR |
|
|
mike - note: call for access ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith in utility room i found unused opening in box and outlets not working. Condensing unit is too close to service gear. exposed romex outside under pattio cover.
|
ELE05-02781
| Final | 10/12/2006 | 10/12/2006 | 10/12/2006 3:12:47 PM | P | NR |
|
|
Phone #: ###-#### Internet Inspection Request from: Tracy Robertson corrections not made
|
ELE06-01609
| Electrical Rough-In | 10/12/2006 | 10/12/2006 | 10/12/2006 2:48:15 PM | P | PASS |
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Patricia Smith R/I Ok
|
ELE06-03608
| Final | 10/11/2006 | 10/12/2006 | 10/12/2006 2:15:08 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Brad Baker
|
ELE06-01905
| Electrical Rough-In | 10/11/2006 | 10/12/2006 | 10/12/2006 1:53:18 PM | P | PART |
|
|
call Mark 10 or 15 minutes early to meet in lobby main hospital; Phone #: ###-#### Internet Inspection Request from: mark morris wall R/I partial ANOP
|
ELE06-00158
| Electrical Rough-In | 10/11/2006 | 10/12/2006 | 10/12/2006 1:52:47 PM | P | PASS |
|
|
call Mark 10 or 15 minutes early to meet in lobby main hospital; Phone #: ###-#### Internet Inspection Request from: mark morris R/I Ok
|
ELE06-02955
| Electrical Rough-In | 10/11/2006 | 10/12/2006 | 10/12/2006 1:18:07 PM | P | NR |
|
|
***Ceiling inspection****; Phone #: ###-#### Internet Inspection Request from: Dan Surerus supports required in many places
|
ELE06-03392
| Final | 10/12/2006 | 10/12/2006 | 10/12/2006 12:06:42 PM | A | PASS |
|
|
Please give me as much advance notice as poosible so I can either be there to let you in or make sure that someone is there. Thanks Shaun ###-####; Phone #: ###-#### Internet Inspection Request from: Shaun Kirkman
|
ELE06-03143
| Electrical Rough-In | 10/11/2006 | 10/12/2006 | 10/12/2006 10:43:26 AM | A | PART |
|
|
don; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles partial ceiling ANOP
|
ELE06-03032
| Final | 10/11/2006 | 10/12/2006 | 10/12/2006 10:13:34 AM | A | NR |
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Patricia Smith enclose open wires in boxes and finish reception area
|
ELE06-03031
| Final | 10/11/2006 | 10/12/2006 | 10/12/2006 10:13:19 AM | A | NR |
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Patricia Smith enclose open wires in boxes and finish reception area
|
ELE06-03516
| Final | 10/11/2006 | 10/12/2006 | 10/12/2006 9:27:50 AM | A | FAIL |
|
|
need final on relocate of new 100 amp circuit for pool building. thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH seal unused opening. no bonding jumper and electrode to neutral. ground as a 3 wire feeder.
|
ELE05-01545
| Final | 10/12/2006 | 10/12/2006 | 10/12/2006 8:45:31 AM | A | PASS |
|
|
This was a temp pole that is no longer on site and rest of job was finaled on an other permit . so i thought we could final this.; Phone #: ###-#### Internet Inspection Request from: steven sewell
|
ELE06-01148
| Rough-In Permanent Service | 10/11/2006 | 10/12/2006 | 10/12/2006 8:30:09 AM | A | PART |
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Patricia Smith this is for temporary connection to re feed power for the building. T/S U/G R Ok to set meter.
|