ELE06-03787
| Conference | 10/11/2006 | 10/12/2006 | 10/12/2006 4:47:06 PM | P | DONE |
|
|
please need as late as possible, gets home from work at 4:00pm.//Ron ###-#### reviewed procedure of call for inspection before ipco can come and re-energize service change, stapling, gec and plastic water pipe, circuit id, and time for calling inspection
|
ELE06-03513
| Electrical Rough-In | 10/12/2006 | 10/12/2006 | 10/12/2006 4:41:15 PM | P | PART |
|
|
Underground Insp. Paul Klindt.; Phone #: ###-#### Internet Inspection Request from: Sean DeLacy u/g in slab ok to pour except around elect room
|
ELE06-02921
| Final | 10/12/2006 | 10/12/2006 | 10/12/2006 3:58:36 PM | P | PASS |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to final
|
ELE06-02306
| Final | 10/12/2006 | 10/12/2006 | 10/12/2006 3:26:14 PM | P | PASS |
|
|
ron; Phone #:- note: call for access- ###-#### Internet Inspection Request from: Patricia Smith called contr, ok to final
|
ELE06-03531
| Final | 10/12/2006 | 10/12/2006 | 10/12/2006 2:37:53 PM | P | FAIL |
|
|
lloyd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles called contr, left corr notice, nec 210.62 showroom receptacles shall be installed every 12' or fraction thereof for show windows, 408.4 circuit directory shall be clear, concise, and provide sufficient detail to distinguish each circuit, 110.12(A) unused openings shall be closed, 300.11(A) shall use support wires for fixtures, cables shall be supported, 725.3(B) abandoned cables shall be removed,BCC no cover shall be done prior to inspection(ceiling)
|
ELE06-01193
| Final | 10/12/2006 | 10/12/2006 | 10/12/2006 2:10:30 PM | P | PASS |
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to final
|
ELE06-03707
| Electrical Rough-In | 10/12/2006 | 10/12/2006 | 10/12/2006 1:04:44 PM | P | PASS |
|
|
don; Phone #: ###-#### Internet Inspection Request from: Patricia Smith corr made, ric ok
|
ELE06-03698
| Final | 10/12/2006 | 10/12/2006 | 10/12/2006 1:03:27 PM | P | PASS |
|
|
lee; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to final, see p/s
|
ELE06-03698
| Permanent Service | 10/12/2006 | 10/12/2006 | 10/12/2006 1:02:59 PM | P | PASS |
|
|
lee; Phone #: ###-#### Internet Inspection Request from: Patricia Smith p/s rec n ok
|
ELE06-03484
| Permanent Service | 10/12/2006 | 10/12/2006 | 10/12/2006 12:19:45 PM | P | PASS |
|
|
Quiznos Service Panel Inspection Call Bob Johnston ###-####; Phone #: ###-#### Internet Inspection Request from: Kristopher wilson p/s, exst meter pak, n, ok
|
ELE06-03524
| Final | 10/11/2006 | 10/12/2006 | 10/12/2006 10:41:51 AM | A | PASS |
|
|
need final re-inspection on damage from fire.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ok to final
|
ELE06-03524
| Permanent Service | 10/12/2006 | 10/12/2006 | 10/12/2006 10:41:20 AM | A | PASS |
|
|
need final re-inspection on damage from fire.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH p/s o/h rec ok
|
ELE06-03786
| Temporary Service | 10/11/2006 | 10/12/2006 | 10/12/2006 10:35:37 AM | A | PASS |
|
|
Ron ###-#### t/s o/h n ok
|
ELE06-01653
| Final | 10/12/2006 | 10/12/2006 | 10/12/2006 9:56:30 AM | A | PASS |
|
|
ok to final
|
ELE06-03513
| Electrical Rough-In | 10/9/2006 | 10/12/2006 | 10/12/2006 9:51:05 AM | A | NR |
|
|
Underground Inspection for Paul Klindt; Phone #: ###-#### Internet Inspection Request from: Sean DeLacy met contr, supposed to be for pm, nr
|
ELE06-03788
| Conference | 10/11/2006 | 10/12/2006 | 10/12/2006 9:44:19 AM | A | CANC |
|
|
Light & grounding inspection, please; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt wrong type request, see ri
|
ELE06-03788
| Electrical Rough-In | 10/12/2006 | 10/12/2006 | 10/12/2006 9:42:41 AM | A | PART |
|
|
Light & grounding inspection, please; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt pool light potting and u/g from light to j-box and ground only ok to cover
|
ELE06-03281
| Electrical Rough-In | 10/11/2006 | 10/12/2006 | 10/12/2006 9:10:54 AM | A | PART |
|
|
Please inspect B-wing underground in AM.; Phone #: ###-#### Internet Inspection Request from: Jim Friend B wing u/g anop ok to cover
|
ELE06-03275
| Electrical Rough-In | 10/12/2006 | 10/12/2006 | 10/12/2006 8:25:10 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/12/2006 at 6:59:32 AM. Contact: ###-####. perimeter walls ok to cover
|
ELE06-02482
| Final | 10/11/2006 | 10/12/2006 | 10/12/2006 8:22:31 AM | A | PASS |
|
|
ed - note: call for access ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to final
|