Inspections for the day of: Monday, October 12, 2009.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01367 BLD-Final10/12/200910/12/200910/12/2009 4:34:11 PMPNR
john Phone #: ###-####
BLD09-01710 BLD-Foundation10/12/200910/12/200910/12/2009 1:25:18 PMPFAIL
Ben Phone #: ###-####. ESC issues were not resolved from last inspection. A stop work has been placed until ESC site prep. inspection has passed. Ok to schedule esc inspections only.
ESC09-00613 Site Preparation10/12/200910/12/200910/12/2009 1:23:59 PMPFAIL
Silt fence not yet installed. Conc. washout was not used. A stopwork has been put on this job until silt fence is installed and conc. has been cleaned up from the site.
BLD09-01308 BLD-Conference10/9/200910/12/200910/12/2009 10:48:41 AMADONE
Roof is complete, Thank you! Internet Inspection Request from: Sandra Daffer
BLD09-01308 DOC - Permit Finaled10/12/200910/12/200910/12/2009 10:48:31 AMPPASS
It apears that all work was done in accordance with local codes and ordinances.
ESC09-00012 Site Preparation10/12/200910/12/200910/12/2009 9:52:53 AM NR
Work has not yet begun.