Inspections for the day of: Tuesday, October 12, 2010.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS10-00294 FIR-Conference10/12/201010/12/201010/13/2010 9:11:35 AMPDONE
Met with Jim on site.
FIR10-00236 INSP-Sprinkler Rough-in10/11/201010/12/201010/12/2010 2:10:54 PMAPASS
Rough-in of the sprinkler piping mostly passed. See the city approved plans for phase II where there are some small areas not yet complete. Insulation needs to be repaired in the existing areas and the insulation needs to be installed in the new areas. I noted atleast two areas created by beams and ducting where additional sprinkler piping will be needed or non-combustible insulation could be added. Insulation will need to be verified prior to a approval for cover being given.
BLD10-00777 FIRE-Final Inspection10/11/201010/12/201010/12/2010 2:05:54 PMPPASS
Life safety passed
BLD10-02118 FIRE-Final Inspection10/11/201010/12/201010/12/2010 10:43:04 AMAPASS
life safety passed.
BLD10-02362 FIRE-Final Inspection10/11/201010/12/201010/12/2010 10:42:36 AMAPASS
life safety passed.