MIS10-00294
| FIR-Conference | 10/12/2010 | 10/12/2010 | 10/13/2010 9:11:35 AM | P | DONE |
|
|
Met with Jim on site.
|
FIR10-00236
| INSP-Sprinkler Rough-in | 10/11/2010 | 10/12/2010 | 10/12/2010 2:10:54 PM | A | PASS |
|
|
Rough-in of the sprinkler piping mostly passed. See the city approved plans for phase II where there are some small areas not yet complete. Insulation needs to be repaired in the existing areas and the insulation needs to be installed in the new areas. I noted atleast two areas created by beams and ducting where additional sprinkler piping will be needed or non-combustible insulation could be added. Insulation will need to be verified prior to a approval for cover being given.
|
BLD10-00777
| FIRE-Final Inspection | 10/11/2010 | 10/12/2010 | 10/12/2010 2:05:54 PM | P | PASS |
|
|
Life safety passed
|
BLD10-02118
| FIRE-Final Inspection | 10/11/2010 | 10/12/2010 | 10/12/2010 10:43:04 AM | A | PASS |
|
|
life safety passed.
|
BLD10-02362
| FIRE-Final Inspection | 10/11/2010 | 10/12/2010 | 10/12/2010 10:42:36 AM | A | PASS |
|
|
life safety passed.
|