Inspections for the day of: Monday, October 12, 2015.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00657 INSP-Sprinkler Rough-in10/12/201510/12/201510/12/2015 3:00:13 PMPPASS
Tenting passed. Piping is ok to cover. Pat is going to provide additional coverage at second floor main landing sidewall.
BLD15-03539 FIRE-Final Inspection10/9/201510/12/201510/12/2015 1:01:36 PMAFAIL
Need city approved plans, fire extinguisher and door hardware addressed.
FIR15-00528 INSP-Sprinkler Rough-in10/9/201510/12/201510/12/2015 9:38:28 AMAPART
Rough-in passed but piping can not be covered until the insulation along the walls has been re-attached to the roof deck and I verify that.
FIR15-00527 INSP-Sprinkler Rough-in10/9/201510/12/201510/12/2015 9:37:59 AMAPART
Rough-in passed but piping can not be covered until the insulation along the walls has been re-attached to the roof deck and I verify that.
BLD15-01671 FIRE-Final Inspection10/9/201510/12/201510/12/2015 8:43:20 AMAPASS
Life safety passed