FIR15-00657
| INSP-Sprinkler Rough-in | 10/12/2015 | 10/12/2015 | 10/12/2015 3:00:13 PM | P | PASS |
|
|
Tenting passed. Piping is ok to cover. Pat is going to provide additional coverage at second floor main landing sidewall.
|
BLD15-03539
| FIRE-Final Inspection | 10/9/2015 | 10/12/2015 | 10/12/2015 1:01:36 PM | A | FAIL |
|
|
Need city approved plans, fire extinguisher and door hardware addressed.
|
FIR15-00528
| INSP-Sprinkler Rough-in | 10/9/2015 | 10/12/2015 | 10/12/2015 9:38:28 AM | A | PART |
|
|
Rough-in passed but piping can not be covered until the insulation along the walls has been re-attached to the roof deck and I verify that.
|
FIR15-00527
| INSP-Sprinkler Rough-in | 10/9/2015 | 10/12/2015 | 10/12/2015 9:37:59 AM | A | PART |
|
|
Rough-in passed but piping can not be covered until the insulation along the walls has been re-attached to the roof deck and I verify that.
|
BLD15-01671
| FIRE-Final Inspection | 10/9/2015 | 10/12/2015 | 10/12/2015 8:43:20 AM | A | PASS |
|
|
Life safety passed
|