Inspections for the day of: Wednesday, October 12, 2016.
Number of inspections: 2
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE15-00495 Final10/11/201610/12/201610/12/2016 4:38:05 PMPFAIL
Walk the 9 story Clearwater building for a final. Start on the roof working way down.
Contact is Toby Groves ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves
10th fl.- Disconnect handle, label disc. for man cave, fire caulk wall penetration for low volt communication conduit, MH lense broke on roof area, completely cover light box for light in stairway. Arc flash in all elec equipment.
9th- Fire caulk above door in elec room.
8th- Open box above luminaire in elec rm.
7th- Fire caulk elec rm corridor wall.
5th- Elec rm fire caulk ceiling to 6th, south unfinished area blank covers for boxes near patio door.
4th- Elec rms shall not be used for storage, fire alarm box open in elec rm.
3rd- Strap flex to trans.
2nd- Blank boxes in server rooms, blank in elec rm, Equipment rm label disconnect.
1st- Fire caulk ceiling to 2nd and N. wall,
VRT- ramp lights trim or cover,
GBAD- 5th Wiring shall be 1 1/2" down from roof deck,
4th- Elec rm control box cover.
Roof HVAC unit service receptacles not working on large units.
2nd- Parking panel labels, Fire caulk ceiling to 3, shall have clear work space.
1st- Communication flex shall not be supported off EMT in future TI.
ELE16-03145 Electrical Rough-In10/12/201610/12/201610/12/2016 9:38:05 AMAPASS
rough in on interior highbays Phone #: ###-#### Inspection requested via web by Tim Dunlop
Asked about lights located at doors 8' above floor with a junction for flexible cord luminaire whip. Location and connection ok. Listing confirmed on luminaires being installed in service area. Rough in ok.