BLD15-03610
| FIRE-Final Inspection | 10/11/2016 | 10/12/2016 | 10/12/2016 3:51:44 PM | P | PASS |
|
|
Life Safety Pass.
|
NAF16-00023
| INSP-Sprinkler Rough-in | 10/11/2016 | 10/12/2016 | 10/12/2016 11:14:40 AM | A | PART |
|
|
Rough-in inspection for grid ceiling areas: -verified 'OK' north stairwell 2nd floor -verified 'OK' first floor with exception of a dozen drops that were not in yet (heads were circled on drawings) -verified 'ok' center office spacing issue previously noted.
Still Pending: - 2nd flr Drop ceiling for hallway in front of elevator and apartments - 2nd floor protector on upright - 2nd flr mechanical room spaced with 5' issue - 1st flr dozen of drop ceiling drops
|