ELE13-00354
| ELE-Aging Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 2:04:04 PM | | FAIL |
|
|
multiple messages left with contractor...still waiting to schedule
|
ELE17-03436
| Final | 10/12/2017 | 10/12/2017 | 10/12/2017 2:02:27 PM | P | PASS |
|
|
inspection for wiring a steam humidifier. Phone #: ###-#### Inspection requested via web by Kelly Felin...job complete, circuit labelled...ok to final
|
ELE17-03436
| Electrical Rough-In | 10/12/2017 | 10/12/2017 | 10/12/2017 2:01:50 PM | P | PASS |
|
|
inspection for wiring a steam humidifier. Phone #: ###-#### Inspection requested via web by Kelly Felin...new 20A 240V circuit...romex covered in flex for protection, toggle switch for disconnect...ok
|
ELE17-03154
| Final | 10/12/2017 | 10/12/2017 | 10/12/2017 1:45:18 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bryan McLaughlin...ok to final
|
ELE17-03458
| Electrical Rough-In | 10/12/2017 | 10/12/2017 | 10/12/2017 12:46:03 PM | P | PASS |
|
|
ready for cover Phone #: ###-#### Inspection requested via web by Steven Meredith...rough ok to cover...mst bath-use of existing circuits, new fan, shower can, and position of outlets
|
ELE17-03455
| Final | 10/12/2017 | 10/12/2017 | 10/12/2017 12:05:43 PM | P | PASS |
|
|
Install floor outlets in stage Phone #: ###-#### Inspection requested via web by Dan Hobdey...job complete...ok to final
|
ELE17-03455
| Electrical Rough-In | 10/12/2017 | 10/12/2017 | 10/12/2017 12:05:21 PM | P | PASS |
|
|
Install floor outlets in stage Phone #: ###-#### Inspection requested via web by Dan Hobdey...added outlets with floor outlet boxes...complete device
|
ELE17-01859
| Final | 10/12/2017 | 10/12/2017 | 10/12/2017 11:47:14 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by John VanZandt...ok to final
|
ELE17-03402
| Final | 10/11/2017 | 10/12/2017 | 10/12/2017 11:09:39 AM | A | PASS |
|
|
Contact: Jason Noble Phone #: ###-#### Inspection requested via web by Deb Gooden..ok to final
|
ELE17-02204
| Rough-In Permanent Service | 10/11/2017 | 10/12/2017 | 10/12/2017 10:34:26 AM | A | PASS |
|
|
contact Gary ###-#### Inspection requested via web by Tracy Robertson...rough ok to cover...p/s u/g n ok 5 meters
|
ELE17-03441
| Electrical Rough-In | 10/11/2017 | 10/12/2017 | 10/12/2017 10:02:53 AM | A | PASS |
|
|
Underground conduit inspection. Call Steve (homeowner) to set up time for access. ###-#### Phone #: ###-#### Inspection requested via web by Cevyn Recla...underground to shop and uffer ok
|
ELE17-01304
| Final | 10/11/2017 | 10/12/2017 | 10/12/2017 9:20:29 AM | A | PASS |
|
|
please call 30mins before - Joe Phone #: ###-####...corrections made...ok to final
|
ELE17-03448
| Electrical Rough-In | 10/11/2017 | 10/12/2017 | 10/12/2017 8:40:12 AM | A | PASS |
|
|
Wall Rough-in Suite 150 Call scott with any questions Phone #: ###-#### Inspection requested via web by David Feller...wall cover ok..2 offices-switching only, back 2 offices dividing wall outlets and switching...rest of outlets and switching prexisting
|
ELE17-02837
| Electrical Rough-In | 10/11/2017 | 10/12/2017 | 10/12/2017 8:22:36 AM | A | FAIL |
|
|
Lockbox is 1205, Josh is your contact at ###-####. Thank You! Phone #: ###-#### Inspection requested via web by Clay Morgan...unable to inspect...no building permit issued
|
ELE14-01203
| Final | 10/10/2017 | 10/12/2017 | 10/11/2017 12:40:23 PM | A | FAIL |
|
|
Aging Phone #: ###-#### Inspection requested via web by Steve VanWinkle...open wiring needs safed off...letters removed...two open sign boxes with exposed wiring and drivers for LED need dealt with
|