BLD18-02444
| BLD-Framing/Rough-in | 10/11/2018 | 10/12/2018 | 10/12/2018 2:39:22 PM | P | PASS |
|
|
Brad Phone #: ###-####. Interior steel stud framed walls and hardlids ok.
|
BLD18-00659
| BLD-Framing/Rough-in | 10/12/2018 | 10/12/2018 | 10/12/2018 2:18:03 PM | P | PASS |
|
|
Mike Phone #: ###-####
|
BLD18-00800
| BLD-Conference | 10/11/2018 | 10/12/2018 | 10/12/2018 2:17:52 PM | P | DONE |
|
|
Please give KJ Savaria a call if you can''t find him at the front office building to let him know you are here. The site is large. Phone #: ###-#### Inspection requested via web by KJ Savaria
|
BLD17-02185
| BLD-Final | 10/11/2018 | 10/12/2018 | 10/12/2018 2:17:41 PM | P | PART |
|
|
Pending on ADA (8th st) per Dave H 11/16/18 Dale Phone #: ###-####
|
BLD18-02186
| BLD-Framing/Rough-in | 10/11/2018 | 10/12/2018 | 10/12/2018 10:50:51 AM | A | PASS |
|
|
Ross Phone #: ###-####
|
BLD18-01730
| BLD-Wall cover | 10/12/2018 | 10/12/2018 | 10/12/2018 10:24:30 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Mark Becker. Draft stop has been installled, but has several gaps. Will verify completion at grid inspection.
|
BLD18-02488
| BLD-Final | 10/11/2018 | 10/12/2018 | 10/12/2018 10:01:56 AM | A | PASS |
|
|
Tom Phone #: ###-####
|
BLD18-02488
| DOC - Permit Finaled | 10/12/2018 | 10/12/2018 | 10/12/2018 10:01:47 AM | P | PASS |
|
|
|
BLD18-02517
| BLD-Final | 10/11/2018 | 10/12/2018 | 10/12/2018 10:01:36 AM | A | PASS |
|
|
Tom Phone #: ###-####
|
BLD18-02517
| DOC - Permit Finaled | 10/12/2018 | 10/12/2018 | 10/12/2018 10:01:21 AM | P | PASS |
|
|
|
BLD18-02178
| BLD-Final | 10/11/2018 | 10/12/2018 | 10/12/2018 9:27:40 AM | A | PASS |
|
|
Elvis Phone #: ###-####
|
BLD18-02178
| DOC - Permit Finaled | 10/12/2018 | 10/12/2018 | 10/12/2018 9:27:31 AM | P | PASS |
|
|
|
BLD18-02444
| BLD-Footing | 10/11/2018 | 10/12/2018 | 10/12/2018 9:17:51 AM | A | PASS |
|
|
Brad-piers Phone #: ###-####
|
BLD18-00573
| BLD-Conference | 10/11/2018 | 10/12/2018 | 10/12/2018 8:30:46 AM | A | CANC |
|
|
I would like the framing to be inspected so I may proceed with drywalling. I have also scheduled the mechanical inspection for the fireplace(install and framing) for friday am too. I hope to get both of these to pass so I may proceed the drywall in the main room. I hope to get to the plumbing for shower area this weekend. just would like to get to the mini-split install after drywall in the main room. Thanks, Robert Phone #: ###-#### Inspection requested via web by Robert Smith
|
BLD18-00573
| BLD-Framing/Rough-in | 10/12/2018 | 10/12/2018 | 10/12/2018 8:26:59 AM | A | PASS |
|
|
I would like the framing to be inspected so I may proceed with drywalling. I have also scheduled the mechanical inspection for the fireplace(install and framing) for friday am too. I hope to get both of these to pass so I may proceed the drywall in the main room. I hope to get to the plumbing for shower area this weekend. just would like to get to the mini-split install after drywall in the main room. Thanks, Robert Phone #: ###-#### Inspection requested via web by Robert Smith
|